File No 93342-SGI Page 5 <br /> 2.2 WELL CONSTRUCTION <br /> Three of the borings will be converted to monitoring wells Borings B-1, B-2, and B-3 will <br /> I be converted to monitoring wells MW-1, MW-2, and MW-3 To accomplish this, the borings <br /> will be drilled into the groundwater bearing layer Undisturbed soil samples will be <br /> collected at five feet intervals above the first encountered groundwater as was mentioned <br /> in the preceding section of this report To install the wells, a flush-threaded schedule 40, <br /> two inch diameter, slotted and blank PVC casing will be placed in the bore holes The <br /> lower 10 feet of the well consist of slotted casing, with a screw-on plug at the bottom The <br /> upper part of the well 1s formed with a solid casing Prior to installation, all casings will be <br /> thoroughly steam cleaned to minimize the chance of contamination of the borings A well <br /> pack, consisting of number 3 sand, will be placed between the boring walls and the PVC <br /> casing to a point at least 2 feet above the uppermost slots in the casing Bentonite seal will <br /> be installed on top of the sand pack and neat cement will then be used to fill the annular <br /> space from bentonite seal to the ground surface The top of the well is set in a christy box, <br /> at the ground surface, with an internally fitted metal locking cover to provide security <br /> Details of the monitoring well construction are shown in Appendix A <br /> 2.3 WELL DEVELOPMENT AND WATER SAMPLING <br /> The subject monitoring wells will be bailed until approximately six well volumes of water <br /> had been removed from the wells <br />' A clean teflon bailer was utilized to develop and collect the groundwater samples Anew <br /> 1 length of nylon cord was utilized prior to development of each well The bailer was <br /> thoroughly cleaned with Alconox solution and then was rinsed with distilled water <br /> Groundwater samples were placed in 40 ml and or one liter containers based on the analysis <br /> to be performed on them and then placed on ice and transported to the laboratory under <br /> the chain-of-custody <br /> The water generated from the well development was stored at the site in a 55 gallon drum <br /> and shall be hauled to a proper disposal site within 90 days, by a licensed hazardous waste <br /> hauler by the owner Our office may be contacted to assist you in disposing the subject <br />' water from the site <br /> ADVANCE SOIL TECHNOLOGY, INC <br />