Work Plan for Additional Phase II Subsurface Investigation <br /> 434 Dr.Martin Luther King Jr.Boulevard <br /> Stockton,California 95206 <br /> Partner Project Number 17-191672.4 <br /> September 25,2017 <br /> Page 1 3 <br /> Objective <br /> The main objective of the project will be to further evaluate the identified impacts of petroleum <br /> hydrocarbons and fuel-related VOCs to soil, soil gas, and/or groundwater as a consequence of a release or <br /> releases from the historical on-site gasoline service stations. <br /> To further investigate the identified impacts, Partner will conduct an Additional Subsurface Investigation. <br /> The investigation scope will include a geophysical survey and the advancement of six step-out borings to <br /> facilitate the collection and analysis of soil, soil gas, and/or groundwater samples. <br /> Please note that contamination delineation is an iterative process and that the investigation design was <br /> based on currently available information.Therefore, additional sampling and/or laboratory analysis beyond <br /> the proposed scope of work may be required to fully characterize the contamination in the vicinity of <br /> previously detected impacts. <br /> Scope <br /> Sampling procedures will generally conform to the requirements of the San Joaquin County Environmental <br /> Health Department(SJCEHD),the SWRCB,and the United States Environmental Protection Agency(EPA). A <br /> state-certified laboratory will analyze the samples and the project will be performed under the responsible <br /> charge of a qualified Partner representative. Laboratory results will be compared with San Francisco Bay <br /> Regional Water Quality Control Board (RWQCB) Environmental Screening Levels (ESLs). <br /> Partner will perform the following tasks for the Additional Phase II Subsurface Investigation: <br /> • Perform a review of available regulatory agency files pertaining to the subject property; <br /> • Prepare a site-specific health and safety plan; <br /> • Notify Underground Service Alert(USA)a minimum of 48 hours prior to drilling activities to clear public <br /> utilities; <br /> • Secure the necessary drilling permit from the SJCEHD. Permit acquisition will involve submitting a <br /> completed application and site plan to the SJCEHD for review and approval and remitting the necessary <br /> fees.The turnaround time of the SJCEHD to issue the permit is expected to be no more than two weeks; <br /> • Notify the applicable regulatory agencies a minimum of 48 hours prior to drilling/backfilling activities; <br /> • Clear boreholes of utility lines through a geophysical survey. Boring placement will be modified as <br /> necessary based on the geophysical survey results to avoid damaging underground features. <br /> • Advance a total of six step-out borings (four exterior and two interior borings) in the vicinity of the <br /> previously identified impacts to a terminal depth of 30 feet bgs or groundwater,whichever is shallower, <br /> collecting soil samples at five-foot intervals from five feet bgs to the terminal depth and a grab <br /> groundwater sample at the terminal depth; <br /> • Soil samples will be collected using a two-foot long by 1.5-inch diameter sampler with a two-foot long <br /> acetate liner and sampling point. The sampler will be advanced by a direct-push drill rig using four- <br /> foot long (three-foot long for the limited-access rig) by 1.25-inch diameter hollow rods with the inner <br /> rods in place. At approximately one foot above the desired sampling depth, an inner rod was removed <br /> and the sampler was advanced to the desired sampling depth to allow undisturbed soil to enter the <br /> sampling liner. The sampler will be retrieved from the subsurface and the soil-filled liner will be <br /> removed; <br /> PARTNER <br />