My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:54:48 PM
Creation date
1/29/2020 11:32:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> I <br /> SAN JOAQUIN COUNTY <br /> �.G Unit Supervisors <br /> Q: L�• ;`: ;2� Donna K.Reran,R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Mike Huggins,R.E.H.S.,R.D.T. <br /> • Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R. .lLs. <br /> • c4`� . .RSP Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S.' <br /> o Laurie A.Cotulla,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H. <br /> Mark Barcellos,R.E.H.S.. <br /> SCOTT HOOTON <br /> BP OIL COMPANY <br /> a <br /> 295 SW 41TH STREET 1 <br /> BLDG.13,SUITE N <br /> RENTON WA 98055 <br /> RE: 1469 Hammer Lane,Stockton(Former BP Oil Site#11191) LOP Site Code: 1126 <br /> WORK PLAN: Investigation Work Plan/Addendum <br /> DATED: October 9,2002 <br /> PREPARED BY: URS <br /> APPROVED: x] <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN tH&S 25299.37,subd(c)(3)]: <br /> 1. To install three groundwater monitoring wells;one on site to define the vertical extent of soil and groundwater <br /> contamination and 2 off site wells to evaluate the lateral extent of groundwater contamination at first water. <br /> 2. To collect soil and groundwater samples for analyses:TPHg,BTEX;IfIBE,and TBA. <br /> 3. To report finding to EHD for review and comment by I4arch 1,2003. <br /> COI-LIIENTS AND NDITI NS: <br /> 1. The extent of groundwater contamination to the north and east will also need to be defined. No wells have <br /> been proposed in those directions. <br /> 2. The WP proposes 30 foot TNAV screen intervals. Soil samples must be taken to determine if any barrier to <br /> vertical migration exist. If barriers exist,well screens must not cross them. <br /> 3. A Site Conceptual Model should be included in the monitoring well installation report. The report deadline is <br /> March 1,2003. � <br /> 4. The"Tri-Regional Board Staff Recommendations For Preliminary Evaluation and Investigation of , <br /> Underground Tank Sites"along with its"Appendix A"and"Appendix B"should be used as guidance <br /> documents. All work and reports which require geological or engineering evaluation must be performed under <br /> the direction of an appropriate California registered or certified professional. <br /> DATED nit410/1)2 BY <br /> Harlin Knoll.Senior REES(209)468-3412 <br /> CC; URS r--- <br /> Tosco—David Camille <br />
The URL can be used to link to this page
Your browser does not support the video tag.