Laserfiche WebLink
tPUBLfllt SERVICES HEALTH <br /> SAN JOAQUIN COUNTY , <br /> ENVIRONMENTAL HEALTH DIVISION ` <br /> Karen Furst, M.D., M.P.H., Health Officer a <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 <br /> f I <br /> . 2091468-3420 <br /> SCOTT HOOTON <br /> BP OIL COMPANY i <br /> 295 SW 41TH STREET <br /> BLDG. 13,SUITE N <br /> RENTON WA 98055 <br /> RE: 1469 Hammer Lane,Stockton(Former BP Oil Site#1119 1) LOP Site Code: 1126 <br /> WORK PLAN: Investigation Work Plan <br /> DATED: September 13,2001 <br /> PREPARED BY: Cambria Environmental Technology,Inc. <br /> APPROVED: x <br /> �b�ED: <br /> AQD� <br /> EDED: Submit <br /> ADE UATE AND NECESSARY ELEMENTS OF THE WORK PLAN[H86 25299.37,subd(c)(3)]: <br /> 1. To install four groundwater monitoring wells. <br /> 2. To collect soil and groundwater samples for analyses:TPHg,BTEX,MTBE, and TBA <br /> 3. To report finding to EHD for review and comment. <br /> WMMENTS AND CONDITIONS: <br /> In addition to the above analyses,groundwater samples must include 1,2-DCA and EDB. <br /> The"Tri-Regional Board Staff Recommendations For Preliminary Evaluation and Investigation of Underground Tank <br /> Sites" along with its"Appendix A" and"Appendix B" should be used as guidance documents. All work and reports <br /> which require geological or engineering evaluation must be performed under the direction of an appropriate California <br /> registered or certified professional. <br /> h <br /> DATE kv BY <br /> Harlin Knoll Senior REHS_(202)68-3442 <br /> CC: Cambria <br /> A Division of San Joaquin County Health Care Services <br />