My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2900 - Site Mitigation Program
>
PR0505509
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 12:54:48 PM
Creation date
1/29/2020 11:32:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505509
PE
2950
FACILITY_ID
FA0006824
FACILITY_NAME
BP STATION #11191
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
02
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Cal/EPA <br /> CALIFORNIA REGIL WATER QUALITY CONTROL SOAR <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road,Suite A = <br /> Sacramento, CA 95827-3098 <br /> "OUA e Phone(916)255-3000 �, Pete Wilson.Governor <br /> FAX(916)255-3015 <br /> 15 January 1998 <br /> Ms. Margaret Lagorio <br /> San Joaquin County Environmental Health Division <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, CA 95201-0388 <br /> i4 <br /> PROPOSAL TO DELAY NO FURTHER ACTION REQUIRED DECISION,BP OIL STATION <br /> NO. 11191, 1469 EAST HAMMER LANE, STOCKTON,SAN JOAQUIN COUNTY <br /> We received your 29 December 1997 letter recommending"No Further Action Required" for the above <br /> site. After reviewing our files and the 22 December 1997"Work.Pian for Underground Storage Tank <br /> Replacement" by Pacific Environmental Group, Inc. for Tosco, Harlin Knoll and I agreed in a 13 <br /> January meeting to delay issuance of a gvo Further coon Require( Letter. The followin issues <br /> need <br />' to be resolved: <br /> • The original underground storage tanks (USTs) were removed. However,the treatment and <br /> i disposal of the residual petroleum product, and the disposal of the tanks and associated <br /> piping needs to be reported. <br /> + The amount and final disposal of the stockpiled contaminated soil from the removal of the <br /> original USTs need to be reported. <br /> • During the removal of the current tanks and associated piping,Tosco has proposed to <br /> conduct further investigation, if necessary. Therefore, the results of any investigation and <br /> any remedial action, should be reported and reviewed by both agencies. <br /> If you have any questions,please call me at(916)255-3128. <br /> t <br /> PATRICIA A. ANDERSON <br />
The URL can be used to link to this page
Your browser does not support the video tag.