Laserfiche WebLink
ARCO ! BP WELL MONITORING DATA SHEET <br /> BTS # Station # ///-2/0,%'0'7d1-,4W2_ <br /> Sampler ,W Date ?/ivy <br /> Well I D ~•7 Well Diameter 2 3 4 G $ <br /> Total Well Depth 6v.35 Depth to Watel s.T.96 <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Refer enced to Pv Grade D 4 Meter (1f req'd) YSt KkCH <br /> Well�rneter well DiatilOU Multiplier 11-0 SS 23 <br /> i 016 6" 1 47 <br /> 3- 0 37 Other radius'.0 163 <br /> Purge Method Bader Sampling Method Batter <br /> Disposable Bailer tsl at e <br /> ive �irDisplacemenr Extraction fort <br /> Tiersi a Other <br /> Extraction Pump <br /> Other <br /> Top of Screen^ � — --__ If well is listed as a no-purge, confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> Z) Gals <br /> I Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp(°F) pH (rnS or pS) Gals Removed Observations <br /> B00 -2grY 7. r iJz s <br /> 130-z 7 s.9 7, r 130/ L <br /> 13oll 7z-9 �. 13aS� 3 <br /> 411015 �z, t 7. r <br /> Did well dewatel? Yes rNo Gallons actually evacuated y <br /> Sampling Time /iia a7W=- 5:f 71 Sampling Date ?//y <br /> Sample l D 44/•7 Laboiatoiy Paceequota Other <br /> Analyzed for n>i{r iTt 1 MTiii: mi R t i i3CA r=Da tlsaua! Other <br /> OD-0 (if Iegrd) Pre-purge � Post-purMe <br /> 4 R P (if teq'd) Pie-purge r11V Post-purge MV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />