Laserfiche WebLink
' • ALTERNATIVE 7 <br /> COMPLETE EXCAVATION FOR OFFSITE DISPOSAL GEOMATRIX <br /> ' PRELIMINARY COST ESTIMATE <br /> Former ConttGroup Grain Elevator <br /> 1805 Harbor Street Page 2 of 2 <br /> Stockton California <br /> TASK <br /> ACTIVITY QUANTITY UNIT UNIT$ COST$ SUBTOTAL$ <br /> DEWATERING and TREATMENT SYSTEM(cont'd) <br /> Other mist 110,000 <br /> treatment system installation,startup,operations 60 day 1,500 90,000 <br /> ' laboratory analysts of discharge water samples 8 ea 500 4,000 <br /> system decommissioning 1 lump sum 10,000 10,000 <br /> spent GAC pickup and disposal I lump sum 6 000 6,000 <br /> DEWATERING and TREATMENT SYSTEM SUBTOTAL S 191,000 <br /> DEMOLITION <br /> field activities 116,000 <br /> fence 2 lump sum 4,000 8 000 <br /> ' decommison existing monitoring wells 4 lump sum 5,000 20,000 <br /> railroad demolition I lump sum 50,000 50,000 <br /> remove 4 500-ft2 asphalt&recycle I lump sum 20,000 20,000 <br /> remove overhead powerline and pole I lump sum 8,000 8,000 <br /> remove concrete slab&recycle I lump sum 10,000 10,000 <br /> DEMOLITION SUBTOTAL S 116,000 <br /> EXCA VA TION and BACKFILL <br /> pre-veld activities 50,000 <br /> pre-profile soil waste 1 lump sum 5,000 5,000 <br /> stormwater controls installed 1 lump sum 10,000 10,000 <br /> '. Utility survey&potholing 1 lump sum 5,000 5,000 <br /> design shonng 1 lump sum 15,000 15,000 <br /> implement utility protection plan 1 lump sum 15,000 15,000 <br /> excavation 1,414,200 <br /> ' mob/demob 1 lump sum 15,000 15,000 <br /> install&remove shoring 1 lump sum 300,000 300,000 <br /> excavate 4,200 cy overburden soil and stockpile 4200 cubic yard 12 50,400 <br /> ' excavate 8,400 cy affected soil 8400 cubic yard 15 126,000 <br /> offsite transportation and disposal of affected soil 14200 ton 40 568,000 <br /> locate and test source of backfill soil 1 lump sum 10,000 10,000 <br /> sample and test stockpiled overburden soil 42 ea 250 10,500 <br /> ' move,place and compact overburden soil 4200 cubic yard 9 37,800 <br /> import fill purchase,transport,place,compact 14200 ton 20 284,000 <br /> import baserock purchase,transport,place,compact 500 ton 25 12,500 <br /> Other mtsc 45,000 <br /> ' field work oversight and coordination 40 days 1,000 40,000 <br /> mist field equipment 1 lump sum 5,000 5,000 <br /> EXCAVATION and BACKFILL SUBTOTAL $ 1,509,200 <br /> ' RECONSTRUCTION <br /> field activities 280,000 <br /> railroad rebuild 300 LF 1 lump sum 250,000 250,000 <br /> ' replace 4500-ft asphalt pavement 1 lump sum 15,000 15,000 <br /> fencing 200 LF 25 5,000 <br /> replace utility pole and powerltne I lump sum 10,000 10,000 <br /> RECONSTRUCTIONSUBTOTAL $ 280,000 <br /> TASK <br /> b ACTIVITY QUANTITY UNIT UNIT$ COST$ SUBTOTAL$ <br /> • 15%protect management cost 0 15 2,231,200 334,700 <br /> 20%contingency cost 02 2,231,200 557,800$ 3,123,700 <br /> ' 1 Zoc_Safe19000s%996=AP4AppB Altemalives xis 1076/20049 53 AM <br />