My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0517454
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:29:17 PM
Creation date
1/29/2020 4:00:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517454
PE
2960
FACILITY_ID
FA0013435
FACILITY_NAME
SHELL PIPELINE (FORMER)
STREET_NUMBER
24550
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
24550 HANSEN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09) <br /> CONESTOGA-ROVERS <br /> &ASSOCIATES <br /> March 8,2010 -2- Reference No. 060223 <br /> with the Central Valley Region requirements for protecting human health and the <br /> environment. <br /> 2. Risk Assessment: Same item 1 response above. <br /> 3. Soil Vapor Sampling:Permanent soil vapor probes have not been installed. The previous <br /> soil vapor samples were collected with Geoprobe tools,as referenced in Science <br /> Applications International Corporations (SAIC) Site Investigation Report,August 6,2007. <br /> 4. Criteria for Soil and Groundwater Samples:The criteria that will be applied for collecting <br /> samples are as follows: <br /> a. Soil sample selection for laboratory analysis: Soil samples from the deep well borings <br /> will be collected continuously using Roto-sonic sampling equipment. Soil samples in <br /> the shallow well borings will be collected at 5-foot intervals using a split spoon sampler <br /> and hollow-stem auger drilling equipment(CRA,October 15, 2009). Soil sample <br /> selection for laboratory analysis will be based on photo-ionization detector (PID) <br /> readings,physical evidence of petroleum hydrocarbons,and significant changes in soil <br /> type. PID readings will be taken every 5 feet in the continuously cored deep well <br /> borings. <br /> b. Groundwater sample selection for laboratory analysis: Based on the elimination of cone <br /> penetration testing(CPT)borings,no grab groundwater samples are now proposed. <br /> Alternatively,monitoring wells will be installed and sampled. <br /> c. Soil sample selection for physical analyses: As referenced in the RA Work Plan,three <br /> soil samples will be collected from the unsaturated overburden for the soil physical <br /> properties analyses. If more than one overburden soil type is encountered,at least three <br /> soil samples will be collected from each different soil type. <br /> 5. GeoTracker Site Postings: The State Water Resources Control Board's GeoTracker database <br /> has been updated to include recent document submissions for the site. We will continue to <br /> update the GeoTracker database with future document submissions for the site. <br /> As discussed during the February 23,2010 meeting,we agreed to the following: <br /> 1. Elimination of the CPT borings from the Monitoring Well Work Plan due to the <br /> significant number of CPT boring already installed and to limit potential cross <br /> contamination. <br /> Worldwide Engineering, Environmental,Construction,and IT Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.