My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0517454
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:29:17 PM
Creation date
1/29/2020 4:00:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517454
PE
2960
FACILITY_ID
FA0013435
FACILITY_NAME
SHELL PIPELINE (FORMER)
STREET_NUMBER
24550
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
24550 HANSEN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ne <br /> CONESTOGA-ROVERS <br /> &ASSOCIATES <br /> November 30,2009 -4- Reference No. 060223 <br /> Proposed Work Tasks <br /> 1. Contact the well owners, <br /> 2. Field verify the well locations to determine if the wells actually exist,and if so, to determine <br /> the specific well location, <br /> 3. Determine the well's operational status, use, and construction, <br /> 4. Submit the findings of tasks 1 through 3 along with a specific well sampling protocol in a <br /> letter report to CVWB staff, and <br /> 5. Request permission to sample the well by obtaining access agreements with the well <br /> and/or property owners. <br /> PROPOSED SCHEDULE <br /> The following schedule is proposed for the additional forensics research and sampling the <br /> water supply wells: <br /> • Work plan addendum for forensics testing:21 January 2010 <br /> • Tasks 1 through 4: 18 February 2010 <br /> • Obtain access agreements: 31 March 2010. <br /> It is our intent to complete the proposed work according to this schedule, however, the <br /> schedule may need to change due to issues beyond our control such as the uncertainty of a <br /> property owner allowing property access and approval to sample their well. <br /> Worldwide Engineering, Environmental, Construction,and IT Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.