My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0517454
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:29:17 PM
Creation date
1/29/2020 4:00:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517454
PE
2960
FACILITY_ID
FA0013435
FACILITY_NAME
SHELL PIPELINE (FORMER)
STREET_NUMBER
24550
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
24550 HANSEN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tei. 921,1.288.06;9p <br /> the , Fex. 925J88.0888 <br /> I&MUDAblembardThr7TGroup ^ <br /> w O ) r <br /> February 5, 2002 P^ <br /> Project 828576 "f'•. <br /> Mr. David Corliss <br /> Golden State Developers. <br /> 43 Quail Court, Suite 204 <br /> Walnut Creek, CA 94596 <br /> Re: Notification of Field Activities <br /> Former Shell Central Valley Crude Oil Pipelines <br /> Hansen Road <br /> Tracy, California <br /> Dear Mr. Corliss: <br /> IT Corporation (IT) has prepared this letter on behalf of Shell Oil Company to inform you <br /> of rescheduled field activities at the above-referenced site. <br /> IT has scheduled to continue to perform the work outlined in the August 1, 2001 IT <br /> document entitled Work Plan - Soil and Groundwater Investigation February 12 through <br /> 15 and 18 through 22, 2002. The scope of work, as outlined in the above-mentioned <br /> document includes the continued advancement of 24 soil borings utilizing direct-push <br /> technology and / or hollow stem auger drilling rig. Our field personnel and contractors <br /> will make every possible effort to avoid disturbance and will maintain a clean work area. <br /> Due to the vulnerability of the planned field activities to site conditions, the currently <br /> scheduled date is subject to ground conditions at the time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.