My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0517454
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:29:17 PM
Creation date
1/29/2020 4:00:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517454
PE
2960
FACILITY_ID
FA0013435
FACILITY_NAME
SHELL PIPELINE (FORMER)
STREET_NUMBER
24550
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
24550 HANSEN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> •« • 7'Gorporatioir <br /> 4005 Port Chicago Hirhwar <br /> Concord. CA 94520-1120 <br /> Tel. 925.288.9898 <br /> Fax. 925.288.0888 <br /> the <br /> f �up <br /> A Member of Th,IT Group <br /> w <br /> Q <br /> January 14, 2002 <br /> Project 828576 <br /> a_ <br /> r <br /> J gym.. <br /> Mr. David Corliss _V r <br /> Golden State Developers. <br /> 43 Quail Court, Suite 204 N rna <br /> Walnut Creek, CA 94596 NO <br /> Re: Notification of Field Activities <br /> Former Shell Central Valley Crude Oil Pipelines <br /> Hansen Road <br /> Tracy, California <br /> Dear Mr. Corliss: <br /> IT Corporation (IT)has prepared this letter on behalf of Shell Oil Company to inform you <br /> of rescheduled field activities at the above-referenced site. <br /> IT has scheduled to perform the work outlined in the August 1, 2001 IT document <br /> entitled Work Plan - Soil and Groundwater Investigation January 21 through 25 and 28, <br /> 2002. The scope of work, as outlined in the above-mentioned document includes the <br /> advancement of 36 soil borings utilizing direct-push technology. Our field personnel and <br /> contractors will make every possible effort to avoid disturbance and will maintain a clean <br /> work area. Due to the vulnerability of the planned field activities to site conditions,the <br /> currently scheduled date is subject to ground conditions at the time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.