My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
24550
>
2900 - Site Mitigation Program
>
PR0517454
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:29:17 PM
Creation date
1/29/2020 4:00:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517454
PE
2960
FACILITY_ID
FA0013435
FACILITY_NAME
SHELL PIPELINE (FORMER)
STREET_NUMBER
24550
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
24550 HANSEN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I R. • • <br /> Page 2 <br /> CRA MEMORANDUM <br /> the surface. The grout will be allowed to set for a minimum of 48-hours prior to resuming drilling <br /> operations. <br /> This procedure will be repeated for the second conductor casing. <br /> 2.0 WELL DRILLING AND GROUTING PROCEDURES <br /> After the conductor casing grout has set for a minimum of 48 hours,drilling operations will resume for well <br /> installations. The well boring will be drilled with sonic drilling equipment. The well boring will be <br /> approximately 6.25 inches in diameter (Figure 1) and continuously cored. Figure 1 shows the typical well <br /> construction for a 180 ft well. As shown,the total depth is anticipated to be 180 fbg,but the actual well <br /> depth will be dependent on the soil types encountered during drilling. <br /> After reaching total boring depth,a 2 inch nominal diameter Schedule 40 PVC well casing will be installed <br /> within the sonic drilling pipe. The drilling pipe cases the borehole to prevent formation sloughing within <br /> the borehole and to allow proper well construction inside the piping. The well will be screened with <br /> approximately 10 ft of 0.02 inch screen from depths of approximately 170 to 180 fbg. A filter pack will be <br /> placed from the bottom of the well screen up to 2 ft above the top of the well screen,followed by a 2-ft-thick <br /> bentonite seal,and cement grout to grade. <br /> This procedure will be repeated for the 115 ft well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.