Laserfiche WebLink
Page 1 of 2 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Tuesday, August 10, 2010 8:33 AM <br /> To: 'Phillips, Sherry' <br /> Subject: RE: Cordes Ranch second phase postponed <br /> I found the application and check and an email requesting conductor cased well specs. <br /> I still need the specs. The only info you provided was on the application and as it reads now, " <br /> flinch boring and 10inch by 50' steel for all wells", can't be done. <br /> send me a side view of the construction specifications, complete with <br /> dimensions/depths/materials shown. Provide centralizers to ensure PVC casing is in center of <br /> conducter/borehole please. <br /> I need this immediately if you still plan to drill Monday. I have to process the permit and my <br /> schedule is very full so finding time to devote to this application will be tough. <br /> has the CVRWQCB been advised of the EHD conductor cased well requirements? are they ok <br /> with them? <br /> From: Phillips, Sherry [mailto:sphillips@craworld.com] <br /> Sent: Monday, August 09, 2010 3:39 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Cordes Ranch second phase postponed <br /> Importance: High <br /> MIKE, <br /> Attached is a copy of the permit application I submitted in July naming a different drill company to <br /> perform the deep well installation. WDC is the drill company that will be onsite for the upcoming work. <br /> sherry phillips <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Monday, August 09, 2010 12:34 PM <br /> To: Phillips, Sherry <br /> Subject: RE: Cordes Ranch second phase postponed <br /> ok.. <br /> Permit issued to, and only good for Greg Drilling...remember? <br /> ok to start Aug 16...call me after your safety meeting to confirm actual start. if you <br /> anticipate a grout placement this same day, then anticipate a ONE hour advance call to <br /> me. <br /> mike. <br /> 8/10/2010 <br />