Laserfiche WebLink
` • � Page 2 of 4 <br /> or another inspector will show up the next morning to continue active inspections and gather <br /> the well construction details and verify grouting completions not sent in the day before. These <br /> inspections will generate hourly charges to the responsible party. <br /> mike. <br /> From: Gaarder, Jeff [mailto:jgaarder@craworld.com] <br /> Sent: Tuesday, July 06, 2010 2:48 PM <br /> To: Mike Infurna [EH] <br /> Cc: Phillips, Sherry <br /> Subject: RE: Cordes Ranch, Tracy BILLING <br /> Mike: <br /> No problem with most of what you are asking for. However, we do have deep wells to install during <br /> August;there are two wells that will be 185 ft deep and will probably take 2 two days to drill, sample, and <br /> build each well (4 days total). Let me know how you want these handled. Thanks. <br /> Regards, <br /> Jeff Gaarder <br /> Conestoga-Rovers & Associates (CRA) <br /> 19449 Riverside Drive, Suite 230 <br /> Sonoma, CA 95476 <br /> Phone: 707.933.2362 <br /> Fax: 707.935.6649 <br /> Cell: 707.333.0795 <br /> Email:jgaarder@CRAworld.com <br /> www.CRAworld.com <br /> Think before you print A <br /> Perform every task the safe way,the right way,every time! <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Friday, July 02, 2010 4:05 PM <br /> To: Gaarder, Jeff <br /> Subject: RE: Cordes Ranch, Tracy BILLING <br /> Please have Sherry Phillips call me with no less than ONE hour notice prior to the first <br /> grout. Travel time from Stockton to Mt. House area is dependent on time of day and <br /> traffic. Early morning and late afternoon traffic is the heaviest at these times and <br /> requires the most travel time. <br /> In addition, all wells started during a day must be completed that day. No overnight/open <br /> or incomplete well installations may occur. Please plan accordingly. If you must start a <br /> well installation after 2pm, anticipate a long travel time to and from the site, with possible <br /> overtime inspection charges possible after—4pm (return travel time to Stockton by <br /> 4:30pm.) It is possible to install multiple wells to the 'hydrated bentonite' phase then call <br /> 7/7/2010 <br />