My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2900 - Site Mitigation Program
>
PR0517530
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:07:06 PM
Creation date
1/29/2020 4:07:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517530
PE
2950
FACILITY_ID
FA0013492
FACILITY_NAME
CHEVRON SERVICE STATION #208118
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95202
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Chevron Products Company 1 1'2gc 3 <br /> Chevron Service Station#20-8118,3355'East Hammer Lane,Stockton,CA *+� September 14,2001 <br /> • Slug Tests. Slug tests will,be performed in each of the three newly installed <br /> monitoring wells to derive:values for transmissivity (T) and hydraulic <br /> conductivity(K). <br /> • Report. A report will be prepared after completion of necessary field work. <br /> The report will include soil boring logs, soil and groundwater analytical results, <br /> chain-of-custody documentation, groundwater gradient map, and conclusions. <br /> Field and laboratory procedures are presented as Attachment A. <br /> SCHEDULE <br /> SECOR is prepared to initiate fieldwork within 4 weeks following approval of this work <br /> plan by the San Joaquin County Environmental Health Department and issuance of <br /> permits by the City of Stockton and San Joaquin County. A report documenting the <br /> findings of the well installation and possible CPT borings is anticipated to be submitted <br /> approximately 8 to 10 weeks after the completion of the field work and upon receipt of <br /> all analytical data. <br /> If there are any questions regarding the contents of this work plan, please call Bill <br /> Brasher of SECOR at (916) 861-0400 extension 284 or Bob Cochran of Chevron at <br /> (925)-842-9655. <br /> Sincerely, <br /> SECOR International Incorporated <br /> Brian Silva William E. Brasher, P.E. <br /> Staff Scientist Project Manager <br /> Attachments: Figure 1 Site Location Map <br /> Figure 2 - Site Map <br /> Attachment A -.Field and Laboratory Procedures <br /> cc: Bob Cochran, Chevron Products Company, San Ramon, CA <br /> Marty Hartzell, RWQCB, Sacramento, CA <br /> OChevron\2081 I81Reports1208118 Muni WP 260Ldoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.