My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1140
>
2900 - Site Mitigation Program
>
PR0527227
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2020 5:56:42 PM
Creation date
1/29/2020 4:29:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527227
PE
2950
FACILITY_ID
FA0005390
FACILITY_NAME
KNOWLES PROPERTY
STREET_NUMBER
1140
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749026
CURRENT_STATUS
01
SITE_LOCATION
1140 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis,Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Knowles Property <br /> Job Location: 1140-1148 W. Hammer Ln., Stockton, CA <br /> Client Name: Edwin H. Clock <br /> Project Number: 748 <br /> General Work Description: Install two soil borings to investigate current soil and groundwater <br /> conditions. <br /> SSP Prepared by: Greg Stahl <br /> On-site Safety Officer: Joe Vasquez/ <br /> Project Safety Officer: Greg Stahl <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors <br /> working for GZA at the job site. All personnel working for GZA at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from the safety provisions set-forth in this SSP, but only to upgrade or <br /> increase the safety requirements. GZA personnel may suspend work if unsafe working <br /> conditions are identified or observed, or unauthorized modifications to the safety provisions set- <br /> forth in this SSP are made. If changes in site or working conditions require changes in safety <br /> procedures, appropriate amendments to this SSP will be provided by the GZA project manager or <br /> supervisor, with the written approval of the GZA Health and Safety Director. <br /> PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.