Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all GZA work sites. Level D includes: <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> For each task on this project, identify additional protective garments as required. Include the <br /> conditions under which the level of PPE would be modified for each task. <br /> Task(s) Condition 7Evacuate <br /> el Garmentls) <br /> None Working Near Vehicle Orange Safety Vests or <br /> other Hi Vis garments <br /> 1 >20 ppm for 5 minutes 1/2 Face Respirator w/OV <br /> cartridges <br /> 1 >200 ppm for 5 minutesSite Full Face Respirator w/OV <br /> cartridges <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GZA hazardous waste sites. <br /> Site will be secured as follows: <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone. <br /> MARK WORK ZONES ON SITE MAP O CHECK WHEN DONE. <br /> PAGE <br />