Laserfiche WebLink
BORING NO.B-31 <br /> �La olRrRono N I PAGE 1 OF 1 <br /> ci PROJECT NO:828576 CLIENT:SHELL OIL <br /> w LOGGED BY:TG DATE DRILLED:2-14-02 <br /> z FORMER B-31 DRILLER:VIRONEX LOCATION:HANSEN ROAD at SHULTE ROAD <br /> = PIPELINE DRILLING METHOD: DIRECT PUSH HOLE DIAMETER:2" <br /> � <br /> SCHULTE RD. SAMPLING METHOD: CONTINUOUS HOLE DEPTH: 12'� TRENCH CASING TYPE:- WELL DIAMETER:- <br /> SLOT SIZE:- WELL DEPTH:- <br /> LOCATION MAP GRAVEL PACK:- CASING STICKUP:- <br /> wo^ w <br /> WELL > >w C. a. <br /> COMPLETION o w > W a J <br /> 00 z zo aw o � <br /> LU A <br /> a0 M0 a00 0 � i �U' 00 <br /> No Mist CL SILTY CLAY:dark brown;-15%fine sand;25%silt;60%clay;soft;no <br /> product odor <br /> z 2 <br /> 4 <br /> a <br /> • . <br /> No Dmp As above;-20%fine sand;10%coarse sand and fine gravel;no product <br /> e, 6 odor <br /> C <br /> m• <br /> E. <br /> m <br /> U' <br /> •z 8 <br /> • <br /> No Dmp 10 No recovery <br /> 12 <br /> BOTTOM OF HOLE=12' <br /> 14 <br /> Ground not compacted after excavation;rig sinking at 4;rods stuck; <br /> abandoned hole at 12' <br /> / N:\Lags\828576\B-31-1.dwg Wed, 06/Mar/02 04:03pm Iwohlgren <br />