Laserfiche WebLink
... Memorandum <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD s CENTRAL VALLEY REGION <br /> 3443 Routier Road Phone: (916) 361-5600 <br /> Sacramento, CA 95827-3 ATSS 8-495-5600 <br /> TO: Files VL�6ROM: Scott Walker <br /> J(jN Asso. Eng. Geol . <br /> ENVIROMENTAL HEALTH <br /> F ERM IT/SERVICI=S <br /> DATE: 26 May 1988 SIGNATURE: <br /> SUBJECT: KNOWLES GAS STATION, 1140 WEST HAMMER LANE, STOCKTON <br /> On 26 May 1988 , a meeting (see attached roster) was held to <br /> discuss the Knowles gas station soil and groundwater <br /> investigation. <br /> On 17 March 1987, G underground storage tanks were removed from <br /> the property and 8 soil samples were taken and analyzed for BTX&E <br /> and chlorinated hydrocarbons (EPA-8020/8015) and lead (EPA- <br /> 3050/7420) . A representative from the San Joaquin Local Health <br /> District (SJLHD) was present during the soil sampling. Benzene <br /> was found at fairly low levels (0. 071 to 0. 673 ppm) near tanks 1- <br /> 4 but at significantly higher levels (2 . 556 to 41. 278 ppra) ;year <br /> tanks 5 and 6 . Toluene was found at <0 . 001 to 226. 016 ppm, xylene <br /> at <0. 071 to 203 . 995 ppm, and ethyl benzene at <0. 001 to 33 . 135 <br /> ppm. Toluene, xylene, and ethyl benzene were also elevated near <br /> tanks 5 and 6 . Lead was found at 7 , 0 to 10. 0 ppm. The soil- <br /> samples were taken at the fill pipe ends of tanks 1-4 , ,at both <br /> ends of tanks 5 and 6, and at depths of 21 feet below fill to 28 <br /> feet below asphalt. <br /> On 10 April 1987 the soil at tanks 5 and 6 was resampled at <br /> depths of 30 to 34 feet and analyzed for BTX&E and TPH (gas) <br /> (modified EPA-5030/8020/8015) . Benzene was found at <1. 0 to 1. 2 <br /> ppm, total BTX&E at <1. 0 to 7 , 6 ppra, and TPH at <1. 0 to 4 .4 opm. <br /> In response to the soil sample results, the SJLHD requested an <br /> initial ground water investigation (see attached map) . Three <br /> hollow stem auger soil borings were drilled on 2K September 1987 <br /> to a depth of 65 feet near the perime-t-er of the tank. pit. The <br /> boreholes were completed as monit-or wells with 30 feet of 0. CI- <br /> inch PVC: well screen. Monitor well #3 was screened to a depth of <br /> 56 feat due to heaving sands. Soil samples taken at 20 -:eet and <br /> 45 to 50 fee;: frog, the borings showed <0.5 ppm BTX&E and TPH gas <br /> at <.1. 0 to 3 . 4 ppru. Water samples taken on. 1 October 1987 showed <br /> benzene (State Action Level (SAL) -0. 7 rrb) at 36. 0 to 85 . 0 ppb. <br /> Toluene (SAL-100 ppb) at 1. 1 to 20 . 0 ppb, Xylene (SAI - <br /> ,-620 ppb) a <br /> 9 . 0 to 100. 0 ppb, and ethy].benzene (SAL-680 Fpb) at <:, 5 to 1. 3 <br /> Ppb were also found. TPH (gas) was foi-,nd at 290 to 330 ppb. <br /> Resampling of the wells on 2 February 1988 shower,? sign .ficantly <br />