Laserfiche WebLink
Mr . Scott Walker <br /> November 22 , 1988 <br /> 202/799-5027 . 02 <br /> Page 5 <br /> Week <br /> Work Step 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Permitting/Clearance <br /> Scheduling <br /> Drilling, Well Instal- <br /> lation and Soil <br /> Sampling <br /> Well Development , <br /> Surveying and Moni- <br /> toring <br /> Water Sampling <br /> ( Includes first <br /> round of quarterly <br /> sampling) <br /> Laboratory Analyses <br /> Preparation of Soil <br /> Remediation Proposal <br /> ( Includes soil <br /> remediation time <br /> line) <br /> Preparation of Prob- <br /> lem Assessment <br /> Report <br />