My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1120
>
3500 - Local Oversight Program
>
PR0545244
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 9:21:17 AM
Creation date
1/30/2020 8:30:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545244
PE
3526
FACILITY_ID
FA0024606
FACILITY_NAME
FORMER KNOWLES STATION
STREET_NUMBER
1120
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07749027
CURRENT_STATUS
02
SITE_LOCATION
1120 W HAMMER LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1990-04-24 15 : 46 )5 323 0930 MAGNOLIA ENEF Vol '< PEF- INING 002 P01 <br /> MAGNOLIA ENVIRONMENTAL SERVICES <br /> GASOLINE CONTAMINATED SOIL REMEDIATION <br /> PROCESS AND EQUIPMENT DESCRIPTION <br /> PROCESS DESCRIPTION <br /> Phase—I (No Carbon C�aniater ) <br /> Gasoline contaminated soil is transported from the contaminated <br /> soil stockpile to the process equipment by a front-end loader <br /> which feeds the contaminated Boil into a three cubic yard feed <br /> bin. The material gravity feeds from the teed bin into an <br /> enclosed auger syatem which Is positioned under the fed bin. <br /> Vacuum linen leading to a bag house (positioned over the enclosed <br /> auger syntom) are connected to the auger system (approximately <br /> midway at oach Of two auger sections) . The bag house functions to <br /> establish a continuous vacuum within the enclosed auger system <br /> and removes dust particulates from the air stream. <br /> In accordw ce with air quality permit conditions, no more than <br /> 150 cubic yards per day of contaminated material will he <br /> prOceOsad utilizing the above described system. <br /> Phage II (Carbon Canister) <br /> In addition to the process equipment described above, a two <br /> thousand (2, 000) pound Carbon bed will be added if Phase I <br /> Production indicates addition of carbon is economically feasible <br /> ( 2, 000 pounds of carbon is required to accommodate 600 cfm of air <br /> and associated hydrocarbons flowing through the bag house) . Ail <br /> air discharged from the bag house will flow through the carbon <br /> bed and the cicaaned air will then be vented. <br /> BOGause hydrocarbons generated by the process are captured by <br /> the carbon rather than discharged to the air, the permissible <br /> volume of material which can be processed per day can be <br /> substantially increased_ <br /> EQUIPMENT DESCRIPTION <br /> Phase 11 <br /> ( 1 ) One 32 ' long 16" horizontal screw auger; <br /> (2) One 17, long 16" sorew auger positioned @ 450 angle. <br /> (3) One 600 cfm bag house; <br /> ase I e <br /> ( 1 ) Phase I equipment plus a 2, 000 pound carbon bed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.