Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request 02/18/04 Requested Completion Date 02/19/04 <br /> Proj Name Knowles Hammer Lane Prod No 95-013 <br /> Site Address It 40 West Hammer Lane Stockton Ca <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Patrick Riddle Phone No 209-367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 209-468-3442 <br /> Approval Completion Date 1]0,14 Q <br /> Notify regulator and client 48 hours prior to arriving on site Done JPL 02/18/04 <br /> Make sure all downhole equipment, including pumps and W/L probe, are <br /> thoroughly deconned prior to arriving, on site <br /> Monitor DTW/DTB all wells in order <br /> • MW2 3 9 4 1 5 is the order <br /> Purge and sample wells MW3 9 4 1 5 in order <br /> Sample for BTEXITPH <br /> Samples to Argon Labs Put on chain of custody that EDIT' reports are re uired. <br /> Wells are 70 feet deep Water is at —38-40 feet Wells are two inch <br /> Drums are located in rear of store Use separate/existing drums for each well if <br /> possible If you must combine wells 5,1 in one drum You can reuse the drums <br /> from wells 3,4,9 from last round as they were all ND <br /> Clearly label each drum as dedicated for particular well with date of purged water <br /> and approximate gallons per date <br /> Pure 3 to 5 casing volumes BUT NO MORE Average purge volume will be <br /> a roximatel 1-0-14 gallons <br /> Store all drums in rear of store <br /> Take a detailed drum count. <br /> wod.req\knoham doc <br />