Laserfiche WebLink
FROM Ground Zero Analysis PHONE NO : 209 952 9892 Aug 12 1997 01:58PM Pi <br /> WORK REQUEST FORM <br /> Date of Request- 8/12/97 Requested Completion Date._ _by 8/15/97 <br /> Prot Name: Knowles Hamm-Lane Proj No- -013 <br /> Site Address: 1140 West Hammer Lane. Stockton Ca. Task- n/a <br /> Project N ager:_ John Lane Field Tech: A Scoma <br /> Client Contact: Carl Krmwies Phone No. 209-951-9950 <br /> Regulatory Contact- Harlin Knoll Phone No: 209-46$-3442 <br /> Approval Completion Date �j y 9� .4,C "e— <br /> Nob <br /> t <br /> No ator and client 4$ hours rior to arnvin on site <br /> Monitor DTW/DTB all wells. In order <br /> 7 6 $ 2 4 3-1. 5 is the order <br /> Purge and sample wells MVV 8, 2, 4, 3, 1. 5 in order <br /> Sam le for BTEX/TPH <br /> Samples to Argon Labs <br /> Wells are 70 feet degp Water is at 40 feet Wells are two inch <br /> Drums are located in Fear of store. Use sopMte/existing drums for each well if <br /> nos'bble If you must, combine wells 5,1 in one drum. Others were ND <br /> Clearly label each drum as dedicated for particular-well with date of❑urged water <br /> and appro nate..gallons per date. _.. .. <br /> Purge 3 to 5 eosin&volumes. Average purge volume will be approximately ten to <br /> twelve allons. <br /> We11 S is across the street near the sidewalk area. <br /> Store all drums m.rear of store <br /> Take a detailed drum count. <br /> 3IACCEMSW_V;0RXax <br />