Laserfiche WebLink
PROM Ground Zero Analysis PHONE NO. : 209 952 9892 May 08 1997 04.02PM P1 <br /> WORK REQUEST FORM <br /> Date of Request,__1/9/97 Requested Completion Date 5/8/97 „ <br /> Prof Naive: Knowles Hammer Lane Prof No 95-013 <br /> Site Address:,. 1140 West Hammer Lane, Stockton Ca Task- none <br /> Project Manager. John Lane Field Tech A Scoma <br /> Client Contact: Carl Knowles Phone No 209.951-9950 <br /> Regulatory Contact Harlan Knoll Phone Na 209-468-3442 <br /> Approval, Completion Date- OS-69 -11 r C <br /> Notify re lator and eluent 48 hours Drior to arrivin on site <br /> Monitor DTW/DTB_ all wells In order <br /> 7 6 2 8 4 3 1 5 is the order <br /> Purge and sam le wells MW 8 4 1 5 in order_ <br /> Sample for_BTEK/Ti'Hg �- <br /> Samples to Argon Labs — <br /> Wells are 70 feet degR. Water is at 40 feet Wells are two inch <br /> Drums are located in rear of store Use-aeDarate/existing drums for each well if <br /> ssi le If you must combine drums combine wells 5.4 in one drum and wells 8.2 <br /> Clearly label each drum as dedicated for-particular well with date ofRurged water <br /> and approximate gallons per date <br /> Purge 3 to 5 casing volumes Arvera ze Burge volume will be ap ro�tely ten to <br /> twelve gaflons <br /> Well S is across the street near the sidewalk area <br /> Store all drums in rear of store. <br /> Take a detailed drum count. <br /> • <br />