My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
5451
>
2900 - Site Mitigation Program
>
PR0505722
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:03:05 AM
Creation date
1/30/2020 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505722
PE
2951
FACILITY_ID
FA0006961
FACILITY_NAME
KJAX
STREET_NUMBER
5451
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
10122041
CURRENT_STATUS
02
SITE_LOCATION
5451 E HARDING WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> V <br /> REMOVAL AND DISPOSAL OF USED UNDERGROUND PETROLEUM STORAGE TANKS 7 <br /> V <br /> from volatile vapors. Air pressure in-the tank must not 4.3.2 The tank vapor space is to be tested by placing <br /> v exceed 5 pounds per square inch gauge. the combustible gas indicator probe into the fill opening <br /> 4.2.6 One of the safest and simplest methods for with the drop tube removed. Readings should be taken <br /> vapor-freeing a tank is to fill the tank with water. at the bottom, middle, and upper portions of the tank, <br /> However, in certain areas, regulatory requirements for and the instrument should be cleared after each reading. <br /> treatment/disposal of water used in the vapor-freeing If the tank is equipped with a non-removable fill tube, <br /> process may make this method cost-prohibitive. Before readings should be taken through another opening. <br /> employing the method described in 4.2.6.1 through Liquid product must not enter the probe. Readings of <br /> 4.2.6.3, consult local regulations. 20 percent or less of the lower flammable limit must be <br /> obtained before the tank is considered safe for removal <br /> 4.2.6.1 Fill the tank with water until the floating from the ground. <br /> �— product nears the fill opening. Remove the floating 4.3.3 Combustible <br /> product and place it in a suitable container for proper gas indicator readings may b <br /> disposal.Care should be exercised to ensure that neither misleading where the tank atmosphere contains less <br /> nor water is spilled into the tank excavation. than 5 percent by volume oxygen, in a tank vapor- <br /> product <br /> . freed with CO2; N2, or another inert gas. In general, <br /> 4.2.6.2 In the process of filling the tank with water, readings in oxygen-deficient atmospheres will be on the <br /> flammable vapors will be expelled through both the vent high, or safe,side. It may be desirable to use an oxygen <br /> and fill openings,but primarily at the fill opening.Nor- indicator to assess the oxygen concentration. <br /> mal safety precautions should be observed.To minimize <br /> this escape of vapor through the fill opening, the open- 4.4 Removal <br /> ing may be temporarily capped. 4.4.1 After the tank has been freed of vapors and <br /> 4.2.6.3 When the tank is free of vapor, pump out the before it is removed from the excavation,plug or cap all <br /> water and dispose of it in accordance with local regula- accessible holes. One plug should have a 1/8-inch vent <br /> tions. hole to prevent the tank from being subjected to ex- <br /> cessive differential pressure caused by temperature <br /> 4.2.7 Steam can be used to clean and vapor-free a changes.The tank should always be positioned with this <br /> itank.However,a large static charge can build up on the vent plug on top of the tank during subsequent trans- <br /> nozzle of the steam jet. Insulated objects on which the port and storage. <br /> steam impinges can also become charged. If steam is to <br /> be used for either purging or cleaning a tank or other 4.4.2 Excavate around the tank to uncover it for <br /> equipment, the steam discharge nozzle and all conduc- removal. Remove the tank from, the excavation and <br /> tive insulated objects subject to impingement or conden- place it on a level surface. Use wood blocks to prevent <br /> sation should be bonded to the tank or be grounded. movement of the tank after removal and prior to <br /> Steam purging of tanks should be avoided when suitable loading on a truck for transportation. Use screwed <br /> L <br /> alternatives are available. Further reference to steam (boiler) lu s P 8 to plug an Y corrosion holes in the tank <br /> cleaning of tanks is found in NFPA 327. shell. <br /> ,r 4.4.3 When partially or totally removing an existing <br /> underground storage system, a small amount of con- <br /> 4.3 Testing taminated backfill maybe encountered.The contamina- <br /> ,r 4.3.1 The tank atmosphere and the excavation area tion can be due to minor spills and drips during previous <br /> should be regularly tested for flammable or combustible operation of the facility or from drips and minor spills <br /> that may occur during removal. Contaminated backfill <br /> vapor concentrations until the tank is removed from may be a potential safety and environmental hazard. <br /> both the excavation and the site. Such tests are to be <br /> made with a combustible gas indicator which is properly Spills or drips should.be contained to minimize con- <br /> calibrated according to the manufacturer's instructions <br /> tamination during removal. If contamination is severe, <br /> (typically on pentane or hexane in air), and which is consult local environmental officials, the fire marshal, <br /> thoroughly checked and maintained in accordance with or the USEPA for assistance and requirements.See API <br /> the manufacturer's instructions.Persons responsible for Bulletin 1628 for further information. <br /> • testing must be completely familiar with the use of the 4.4.4 Tanks should be labeled after removal from the <br /> .. instrument and the interpretation of the instrument's ground but prior to removal from the site.Regardless of <br /> readings. the condition of the tank, the label should contain a <br />
The URL can be used to link to this page
Your browser does not support the video tag.