Laserfiche WebLink
HORIZON ENVIRONMENTAL INC. <br /> Specialists in Site Assessment,Remedial Testing,Desigh and Operation <br /> September 22, 1999 <br /> Mr. Michael Infurna, Jr. <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> Subject: Submittal of Well Construction Termit Applications <br /> Beacon Station No. 641 <br /> 1210 East Hammer Lane, Stockton <br /> Mr. Infurna: <br /> At the request of Ultramar Inc. (Ultramar), Horizon Environmental Inc. (Horizon) is <br /> forwarding the enclosed two Well Construction Applications (and attachments) for <br /> additional soil borings and monitoring wells at the above-referenced site. Ultramar <br /> previously submitted the Work Plan for an Additional Subsurface Investigation (Horizon, <br /> April 22, 1998) to the San Joaquin County Public Health Services - Environmental Health <br /> Division (SJCPHS-EHD). On May 21, 1999, Ultramar received approval of the proposed <br /> work from the SJCPHS-EHD, and wishes to proceed with the proposed scope of work at the <br /> site. The location of pertinent site features and the proposed soil boring and groundwater <br /> monitoring wells are shown on the rear sides of each of the Well Construction Applications. <br /> Two Well Construction Applications have been completed and are attached with this letter. <br /> One application has been submitted for the proposed onsite soil boring (B-3) and <br /> groundwater monitoring wells (MW-6 and MW-7). The second application has been <br /> submitted for proposed offsite groundwater monitoring well MW-8, which is to be located in <br /> the East Hammer Lane right-of-way. On August 6, 1999, Ultramar finally received an <br /> Encroachment Permit from the City of Stockton. <br /> A third application will be submitted in the future for proposed offsite groundwater <br /> monitoring well MW-9 after an access agreement has been acquired by Ultramar from <br /> Auburndale Properties, the owner of the property to the west of the site. <br /> A copy of the SJCPHS-EHD approval letter and the City of Stockton Revocable <br /> Encroachment Permit No. 99-13 are included with the Well Construction Applications. We <br /> understand that the appropriate fees are $89.00 per application. A check for the Well <br /> Construction Application fees of $178.00 has been enclosed with this letter. The drilling <br /> subcontractor will be V&W Drilling of Rio Vista, California. The proposed work has <br /> been scheduled to begin on Monday, October 18 1999. The drilling is expected to take <br /> approximately three days to complete the proposed scope of work. <br /> 5011 Golden Foothill Parkway,Suite 7 . EI Dorado Hills,CA 95762 • (916)939-2170 + FAX(916)939-2172 <br /> P.O.Box 5283 9 Bakersfield,CA 93388 • (805)589-8389 9 FAX(805)589-1456 <br />