Laserfiche WebLink
Px. Beacon Station No. 36 January 11, 2013 <br /> Stockton California Well Destruction Work Plan <br /> drilled out with,the same-size auger as the original borehole. The bore hole shall be filled <br /> with"fieat cement to within l foot of surface. <br /> Monitoring well MW-10 shall be destroyed by drilling out the well to the width and total <br /> depth of the original bore hole. The resultant bore hole shall be scaled with neat cement <br /> grout via tremie from total depth to within 1 foot of the surface. The grout level.shall be <br /> topped off until stabilized. <br /> Enclosed are two checks to cover the application fees for the two permits in the amount of <br /> :$500 ($375 +:$.125) for the 99c parcel and $3000 ($375 + 21[$125]) for the Shadrall parcels. <br /> Also enclosed are a Licensed Contractor Declaration and Master File Record for eac <br /> I permit application. The destruction work-is scheduled to begin 28 January 2013. Contact <br /> Horizon at 916-939-2170 if you have any questions or require additional information. <br /> Sincerely, <br /> HORIZON IRONMENTAL INC. ° <br /> Rexford Smith, P.-G. No. 5307 <br /> Project Manager 14 <br /> - <br /> -Enclosures Permit Applications . <br /> Right-of-Entry Agreements <br /> Well Destruction Summary Table <br /> Licensed Contractor Declarations <br /> Master File Records <br /> cc: Mr.. Tom Sexton, Ultramar Inc. <br /> i <br /> l <br /> .641 WP Well Destruct Jan 13.doe <br /> _, Project No. 1641.111 2 HORIZON ENVIRONMENTAL-INC. <br />