Laserfiche WebLink
January 1'1,2013 <br /> Beacon Station No. 3641 1 <br /> Well Destruction Work Plan <br /> Stockton California <br /> drilled out with the,same size auger as the original borehole. The.bore hole shall be filled <br /> with neat cement to within I foot of surface. <br /> Monitoring well MW-10 shall be destroyed by.drilling -out the well to'the width and total <br /> depth of the original bore hole. The resultant bore hole shall be sealed with neat cement <br /> 1 foot of the surface. The grout level shall be <br /> grout via tremie from total depth to within <br /> topped off until stabilized. <br /> Enclosed are two checks to cover.the application fees for the two permits in the amount of _ <br /> $500'($375 +$125)for the 99c parcel and$3000 ($375 +21[$125])for the Shadrall parcels. <br /> Also enclosed are a Licensed Contractor=Declaration and Master File Record far each <br /> permit application.n. The destruction work is scheduled to beginin 28--January ry <br /> 2013. Contact <br /> Horizon at 916,939-2170 if you have any questions or require additional information. <br /> F <br /> - Sincerely, .- <br /> HORIZON NVIRONMENTAL INC. <br /> .. s` tit •_1 •. 1 i <br /> Rexford Smith,-P.G. No. 5307 <br /> Project Manager <br /> Enclosures Permit Applications Q <br /> Right-of-Entry Agreements <br /> Well Destruction Summary Table <br /> Licensed Contractor Declarations_ <br /> Master File Records <br /> cc: Mr:Tom Sexton, Ultramar Inc. <br /> i <br /> 641 WP We[IDestn[clJan.t3.doc <br /> Project No. 164!.1,11 2 HORIZON ENVIRONMENTAL INC. <br /> F <br />