My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
3500 - Local Oversight Program
>
PR0545245
>
ARCHIVED REPORTS_XR0002025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 11:54:48 AM
Creation date
1/30/2020 10:40:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002025
RECORD_ID
PR0545245
PE
3528
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
02
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOULOS ENVIRONMENTAL, INC. SAMPLING INFORMATION SHEET <br /> Client: Ultramar Sampling Date: _ 7 <br /> Site: Beacon #3641 Project No.: <br /> 1210 E.Hammer Lane1400 Well Designation: <br /> Stockton,Ca. <br /> Is setup of traffic control devices required? YES time: hours <br /> Is there standing water in the well box? YES Above TOC Below TOC <br /> is top of casing cut level? NO elm If no, see remarks <br /> Is well cap sealed and locked? fO NO If no, see remarks <br /> Height of well casing riser(in inches): I <br /> Well cover type: 8"or 12"UV 12"EMCO 8"or 12"BK 8"Christy <br /> 12"Christy 8"M&D 12"M&D 12"DWP <br /> 12"CNI 36"CNI 12"Pomeco Other: <br /> General condition of wellhead assembly: Excellent Good_.= Fair Poor <br /> Purging Equipment: 2"disposable bailer Submersible pump <br /> 2"PVC bailer Dedicated bailer <br /> 4" PVC bailer Centrifugal pump <br /> Sampled with: Disposable bailer- Teflon bailer Disposable Tubing <br /> Well Diameter: 2" 4" 6" 8" <br /> Purge Vol. Multiplier: 0.16 0.65 1.47 2.61 gal/ft. <br /> Initial Measurement Recharge Measurement <br /> Time: 7 - Time: _ 10: 3 O Calculated purge: ' <br /> Depth of well: &I? Depth to water: S Z - O Actual purge: <br /> Depth to water: S 7. 06 <br /> Start purge: f� ' / Sampling time: <br /> Time Temp erature E.C. pH Turbidity Volume <br /> '2 , 2 7 g <br /> /o : 7• � y <br /> Sample appearance: eco Lock: u#��� <br /> Equipment replaced: (check all that apply) Note condition of replaced item(s) <br /> 2"Locking Cap: Lock: 7/32 Allenhead: <br /> 4"Locking Cap: Lock-Dolphin: 9/16 Bolt: <br /> 6"Locking Cap: Pinned Allenhead (DWP): <br /> Remarks: <br /> Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.