Laserfiche WebLink
' Boring Numbers VE-7/VE-8 _ HORIZON ENVIRONMENTAL INC <br /> Job Number 1641 13 <br /> Site Location Beacon #641, Stockton, CA <br /> Drilling Company Woodward Drilling Drilling Method 10—Inch Hollow Stem Auger <br /> Drilled By Erik, Amador & Van Sampling Method Split—Spoon Sampler <br /> Date Drilled 09/17/97 Total Depth 55 Feet <br />' Logged By L Smith Depth To Groundwater Not Encountered <br /> y747 4. C C <br /> E at N c P— O g <br /> L N i O — C q u 6 <br />' z <br /> a� v 7"i G a Soil 2 a Well C v .._. Comments <br /> o c a 0O L 0 N cO C Description B y Construction <br /> m 0 ac Lo— a <br /> VE-7 VE-8 <br />' 0 9 <br /> 'j 13 18 18 6 SILTYSAND very fine—grained, yellow)sh- <br /> 37 y 2brown.31 brown, dry dense, organic blobs <br /> ba SM Cooing Installation Data <br /> 32 32 VE-7 do VE- <br /> 33— 33 2—inch PVC <br /> 0020—inch screen <br /> 34 34 <br /> 1 35 35 <br /> M 7 <br /> 3611 18 18 67 <br /> V7 13 38 <br /> 37 37- <br /> 38— 38- <br /> 39— 39 <br /> 40 40 <br /> g 10 18 18 100 SANDY SILT yellowish—green, damp to ML <br /> 41 v) 12 41 moist, medjurri dense <br /> 42 42- <br /> 43— 43 <br /> i44— 44 <br /> 45 45 <br /> 16 18 18 49 SAND medium— to coarse—grained SP <br /> 46 v) 26 46 medium gray dry, dense <br /> 47 47- <br /> 48— 48- <br /> 49— 49 <br /> 50 50 <br /> 17 <br /> 51 26 18 18 a6 51 SILTY SAND, yellow)ah—brown, damp, very SM <br /> v1 35 dense <br /> 52 52 <br /> 53 53 <br />' <br /> 54 54 SILTY h SAND, tto light moist, <br /> 23 on 9 g►nY. <br /> 55 �' 26 1818 187 <br /> 28 55 very dense <br /> Total depth — 55 feet toga <br /> 56 56 <br /> 57 57- <br /> 58— 58- <br /> 59— 59 <br /> 60 60 <br /> Page 2 Of 2 <br />