Laserfiche WebLink
Mr. James Taylor - 4 - 4 October 2007 <br /> The quarterly reports should include laboratory data sheets, which may be provided on <br /> electronic media. <br /> A well installation report shall be provided within 60 days of well installation and needs to <br /> include well logs, construction diagrams, and a figure. <br /> A Recirculation Status Report shall be provided within 120 days of starting the recirculation <br /> system. The Recirculation Status Report should provide an estimate of the extent of the <br /> groundwater mound, if any, at injection well IW-BH2A, an estimate of the hydraulic <br /> conductivity at the injection area, an estimate of the radius of influence of the extraction well, <br /> and an estimate of the hydraulic conductivity in the extraction area. <br /> Within 14 months of starting the recirculation system, a Pilot Study Evaluation Report shall <br /> be provided to Regional Water Board staff. The Pilot Study Evaluation Report should provide <br /> an assessment of the effectiveness of the recirculation on contaminant reduction. The Pilot <br /> Study Evaluation should update the groundwater model and assess the potential for an <br /> expanded groundwater recirculation system to accelerate the rate that site pollutants are <br /> degraded. <br /> Summary <br /> Thank you for suggesting a means to accelerate the treatment of carbon tetrachloride <br /> observed as a result of the zero-valent iron injections. The proposed recirculation pilot study <br /> should refine the groundwater model and evaluate the potential to treat a greater volume of <br /> groundwater by forcing it through the existing iron. If injection into IW-BH2A causes an <br /> increase in water surface in MW-3B, about 90 feet away, ContiGroup shall notify Regional <br /> Water Board staff and decrease the injection rate. <br /> By 30 October 2007, please provide a work plan and schedule for installation and <br /> development of injection wells, extraction wells, and monitoring well MW-13 to Regional Water <br /> Board staff and a copy to San Joaquin County Environmental Health Department. <br /> The attached draft Monitoring and Reporting Program proposes a monitoring program for the <br /> recirculation pilot study and for groundwater plume monitoring. Please review the draft <br /> monitoring program and provide comments by 30 October 2007. <br /> If you have any questions or comments, you may contact me by telephone at (916) 464-4680, <br /> by/ mail at rrell waterboards.ca. ov, or by regular mail at the letterhead address. <br /> l *41 <br /> AMY;ERRELL <br /> Private Sites Cleanup Unit <br /> Enclosure <br /> cc: Mr. Michael Infurna, San Joaquin County EHD, Stockton <br /> Ms. Linda Huff, Huff & Huff Inc., Oak Brook IL (with enclosure) <br />