Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO.R5-2004-0160 -2- <br /> CONTIGROUP COMPANIES,INCORPORATED <br /> FRENCH CAMP GRAIN ELEVATOR <br /> ENHANCED REMEDIATION PILOT STUDY <br /> SAN JOAQUIN COUNTY <br /> Field measured parameters shall follow the schedule below: <br /> Parameters Units Type of Sample Sampling Frequency <br /> Groundwater Elevation Feet,Mean Sea Level Grab Every time MW-3B,MW-413, <br /> Oxidation-Reduction Potential Millivolt Grab MW-9B,and MW-10B are <br /> Electrical Conductivity uhmos Grab sampled <br /> Dissolved Oxygen mwi Grab <br /> H 0.1 units Grab <br /> Field testing instruments (such as those used to test oxidation-reduction potential and dissolved oxygen) <br /> may be used provided that: <br /> 1. The operator is trained in proper use and maintenance of the instruments'-- <br /> 2. <br /> nstruments;2. The instruments are field calibrated prior to each monitoring event; <br /> 3. Instruments are serviced and/or calibrated by the manufacturer at the recommended frequency; <br /> and <br /> 4. Field calibration reports are provided with the appropriate monitoring report. <br /> REPORTING <br /> In reporting monitoring data,the Discharger shall arrange the data in tabular form so that the date, <br /> sample type, and reported analytical result for each sample are readily discernible. The data shall be <br /> summarized in such a manner to clearly illustrate compliance with waste discharge requirements and <br /> spatial or temporal trends, as applicable. The results of any monitoring done more frequently than <br /> required at the locations specified in the MRP shall also be reported to the Regional Board. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> Groundwater Monitoring Reports shall be prepared under the direct supervision of a Registered Engineer <br /> or Geologist and signed by the registered professional. <br /> Quarterly reports shall be submitted to the Board by the 1st day of the second month following the end <br /> of each calendar quarter(i.e.,by 1 February, 1 May, 1 August, and I November). The reports shall <br /> be submitted separately from the quarterly monitoring reports required by MRP No. 5-00-858. At a <br /> minimum,the reports shall include: <br /> 1. Results of monitoring, including a narrative description of all preparatory,monitoring, sampling, and <br /> analytical testing activities for the groundwater monitoring. The narrative shall be sufficiently <br /> detailed to verify compliance,with the WDR,this MRP, and the Standard Provisions and Reporting <br /> Requirements. The narrative shall be supported by field logs for each well documenting depth to <br /> groundwater;parameters measured before,during, and after purging; calculation of casing volume; <br /> total volume of water purged, etc.; <br /> 2. Copies of all laboratory analytical report(s); <br /> 3. Cumulative data tables containing the water quality analytical results and depth to groundwater; <br />