My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9504
>
2900 - Site Mitigation Program
>
PR0508462
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 12:22:14 PM
Creation date
1/30/2020 11:02:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508462
PE
2960
FACILITY_ID
FA0008093
FACILITY_NAME
CONTINENTAL GRAIN CO
STREET_NUMBER
9504
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
9504 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO.R5-2003-0166 • -3- <br /> CONTIGROUP COMPANIES <br /> FRENCH CAMP GRAIN ELEVATOR <br /> ENHANCED BIOREMEDIATION PILOT STUDY <br /> SAN JOAQUIN COUNTY <br /> 6. A discussion of any data gaps,potential deficiencies/redundancies in the monitoring system or <br /> reporting program and the anticipated date for an effectiveness evaluation of the pilot study. <br /> A letter transmitting the self-monitoring reports shall accompany each report. Such a letter shall <br /> include a discussion of requirement violations found during the reporting period, and actions taken <br /> or planned for correcting noted violations, such as operation or facility modifications. If the <br /> Discharger has previously submitted a report describing corrective actions and/or a time schedule <br /> for implementing the corrective actions,reference to the previous correspondence will be <br /> satisfactory. The transmittal letter shall contain the penalty of perjury statement by the Discharger, <br /> or the Discharger's authorized agent, as described in the Standard Provisions General Reporting <br /> Requirements Section B.3. <br /> The Discharger shall implement the above monitoring program as of the date of the Order. <br /> Ordered by: <br /> /, --THOMAS R. PINKOS,Executive Officer <br /> 17 October 2003 <br /> DLL <br />
The URL can be used to link to this page
Your browser does not support the video tag.