My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9504
>
2900 - Site Mitigation Program
>
PR0508462
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 12:22:14 PM
Creation date
1/30/2020 11:02:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508462
PE
2960
FACILITY_ID
FA0008093
FACILITY_NAME
CONTINENTAL GRAIN CO
STREET_NUMBER
9504
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
9504 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Reg•al Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Winston H.Hickox Gray Davis <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swreb.ca.gov/mgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> 8Z Z Wd 01 gnu io, <br /> 9 August 2001 <br /> Mr. Daniel Decker <br /> ContiGroup Companies, Inc. <br /> 277 Park Avenue <br /> New York,NY 10172 <br /> REVISED PRE-REMEDIATION TESTING WORK PLAN APPROVAL, CONTIGROUP <br /> COMPANIES, INC.,9504 S. HARLAN ROAD, FRENCH CAMP, SAN JOAQUIN COUNTY <br /> We have reviewed the 3 August 2001 Revised Pre-Remediation Testing Work Plan (Revised Work Plan) <br /> submitted by Haley&Aldrich, hie. on behalf of Huff&Huff, Inc. for the ContiGroup Companies, Inc. <br /> French Camp Grain Elevator facility. The Revised Work Plan modified the proposed pumping tests by <br /> including groundwater level measurements in all site monitoring wells before, during and after the pump <br /> tests. Natural attenuation parameters were expanded from two to five samples collected within each <br /> water-bearing zone and from within and outside of the plume. The Revised Work Plan also includes <br /> hydropunch samples southwest and southeast of monitoring well MW-2A. <br /> The Revised Work Plan is hereby approved on the condition that a figure is provided by 24 August 2001 <br /> showing the proposed locations of the hydropunch samples near MW-2A. By 16 November 2001, we <br /> request you submit an interim remedial action plan (IRAP) that includes the results and findings of the <br /> pre-remediation testing along with a schedule to implement the IRAP. Please notify me a minimum of <br /> 72 hours prior to initiation of field work so that I may be present to collect split samples. If you have <br /> any questions, you may contact me at (916) 255-3119 or by email at lewisd ,rb5s.swrcb.ca.gov. <br /> 112JCCC Xz" <br /> DEVRA LEWIS <br /> Environmental Specialist II <br /> cc: Mr. Jeff Wong, San Joaquin County Health Department, Stockton <br /> Ms. Linda Huff, Huff&Huff, LaGrange, Illinois <br /> Mr. Joe Weidmann, Haley&Aldrich, Inc., San Diego <br /> California Environmental Protection Agency <br /> pia Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at http://www.swrcb.ca.gov/mgcb5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.