My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WELL INSTALLATION REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9504
>
2900 - Site Mitigation Program
>
PR0508462
>
ARCHIVED REPORTS_WELL INSTALLATION REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:18:11 PM
Creation date
1/30/2020 11:06:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WELL INSTALLATION REPORT
RECORD_ID
PR0508462
PE
2960
FACILITY_ID
FA0008093
FACILITY_NAME
CONTINENTAL GRAIN CO
STREET_NUMBER
9504
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
9504 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well Installation Report <br /> FRENCH CAMP GRAIN ELEVATOR <br /> 9504 South Harlan Road,French Camp, California <br /> 1.0. INTRODUCTION <br /> At the request of Ms.Linda Huff of Huff&Huff,Inc.,Advanced GeoEnvironmental,Inc.(AGE)has <br /> prepared this Well Installation Report for the five (5) wells installed at 9504 South Harlan Road, <br /> French Camp, California(site). The scope of work included: 1)the installation, development, and <br /> well-head survey of two groundwater extraction wells, two groundwater injection wells, and one <br /> ground water monitoring well; 2) groundwater and soil disposal and, 3) preparation of this report. <br /> The site and the surrounding area are illustrated on Figure 1. On-site structures and monitoring well <br /> locations are illustrated on Figure 2. Well construction details the new wells are included as Table <br /> 1. <br /> 2.0. SUMMARY OF SERVICES PROVIDED <br /> Five groundwater wells(four remedial and one monitoring)were installed at the site from 21 through <br /> 26 April 2008 for a groundwater remediation pilot study. A summary of the well installation <br /> activities include: <br /> • The installation,development and well-head survey of two groundwater extraction wells, two <br /> groundwater injection wells and one ground water monitoring well; <br /> • Continuous core soil sampling of two groundwater extraction wells and one groundwater <br /> monitoring well; <br /> • Disposal of well development groundwater and soil cuttings generated during well <br /> installation; <br /> 3.0. PROCEDURES <br /> The field work was performed in accordance with procedures outlined in the Huff&Huff, Inc.- <br /> prepared Well Installation Work Plan dated 01 February 2008 which was approved by the California <br /> Regional Water Quality Control Board-Central Valley Region(Regional Board)in their letter dated <br /> 13 February 2008 (Appendix A). The work was performed in accordance with the San Joaquin <br /> County Well Standards. Relevant regulatory correspondences and the San Joaquin County <br /> Environmental Health Department (EHD)well installation permit are included in Appendix A. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.