My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
3500 - Local Oversight Program
>
PR0545253
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 1:10:56 PM
Creation date
1/30/2020 11:32:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545253
PE
3528
FACILITY_ID
FA0009191
FACILITY_NAME
PENNY NEWMAN GRAIN
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
1805 HARBOR RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 IV <br /> 4-11 <br /> Mr. Steve Oliver -2- June 17, 1999 <br /> Task Amount Pre-Approved Comments <br /> Preparation of Summary $1,085.00 <br /> Report <br /> TOTAL PRE-APPROVED $6,893.00 <br /> Reimbursement of the pre-approved costs is dependent upon the following items. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. <br /> • The work products must be acceptable to the PHS/EHD. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the ATC proposal in my pre-approval above,please be aware that <br /> you will be entering into a private contract: the State of California cannot compel you to sign <br /> any specific contract. This letter pre-approves the costs as presented in the proposal dated <br /> May 10, 1999 by ATC for conducting the work directed by the PHSIEHD. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary corrective action work. <br /> The legislation governing the Fund requires that the Fund assist you in procuring contractor and <br /> consultant services for corrective action. If you need assistance in contracting for corrective <br /> action services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultantprepares their <br /> invoices to include the required break down of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> 0 subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the PHS/EHD. <br /> California Environmental Protection Agency <br /> Ca Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.