Laserfiche WebLink
r <br /> V � <br /> ASSOCIATES I RIC , <br /> Report Preparation <br /> Upon completion of all field activities, a summary report will be prepared for submittal to <br /> PHSIEHD. ATC will prepare a report that will include a description of all field activities, <br /> laboratory analytical results, boring logs, and recommendations. <br /> All work. described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. A completed Site Safety Plan and Quality Control/Quality <br /> Assurance Plan are already on-file with PHS/EHD for this site. All field work will be completed <br /> in accordance with these plans. <br /> L Proiected Schedule <br /> Once PHSIEHD approval of this workplan has been received and access agreements with <br /> Burlington North Santa Fe Railroad and the City of Stockton have been finished, ATC will <br /> schedule drilling activities. It is anticipated the drilling will be completed in one day. ATC will <br /> notify PHS/EHD at least.48 hours prior to beginning any field activities. The summary report <br /> k <br /> will be submitted to PHS/EHD approximately four to five weeks after the completion of field <br /> activities. <br /> If you have any questions or :require additional information regarding this workplan, please <br /> contact us at(209) 579-2221. <br /> Respectfully submitted, <br /> ATC Associates Inc., <br /> Drew Van Allen ��� E5$/n�� <br /> Staff Scientist JEANNE <br /> �v <br /> C7 r� <br /> 0. �7 410 <br /> Jeanne Hornsey; P.E. &p• <br /> Registered Engineer No. C47410 , IL \� <br /> Attachments OF w <br /> cc: Mr. Steve Oliver, Continental Grain <br /> Mr. George Handler, Continental Grain <br /> wA625001reportslwkpH.doc 4 <br />