Laserfiche WebLink
V � <br /> A S S 0 C i A T E S l N C . <br /> All work described in this workplan will be .performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with Smith <br /> Technology's Site Safety Plan (SSP) and Quality Control/Quality Assurance Plan submitted with <br /> Smith Technology's Workplan for Subsurface Investigation, dated September 10, 1997. } <br /> I <br /> Proiected Schedule <br /> Once approval of this workplan has been received, ATC will schedule drilling activities. ATC will <br /> notify PHS/EBD at least 48 hours prior to beginning any field activities. The summary report will <br /> be submitted :to PHS/EHD approximately four to five weeks after the completion of field <br /> I activities. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact us at (209) 57972221. <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> Dom Y�: <br /> AA- <br /> Drew Van Allen <br /> Staff Scientist 1 <br /> JUNK' <br /> -o BEY <br /> Jeanne Homsey, P.E. . Ex IZ <br /> Registered Engineer No. C47410 <br /> Attachments <br /> cc: Mr. Dan Raper, Continental Grain <br /> w:1b25001reportslwkpweLdoc 4 <br /> r <br /> c <br />