Laserfiche WebLink
Smith Technology sn-E sA.FETY PN <br /> On-site communications: 0 Radio El Verbal 0 Hand Signals <br /> 0 Other ' <br /> Designate hand signals here: <br /> 5 <br /> 'rE <br /> Off-site communications: 0 Radio ® Telephone } <br /> a <br /> 0 Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP L7 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective "equipment <br /> Vie:, glo_v_es coveralls) will_be placed on in a 5- <br /> gallon bucket with soil cuttings <br /> Location of Wash Water: Restroom on-site ' <br /> Location of Toilet. Restroom on-site <br /> r <br /> Locafion of Drinking Water. Smith Technology truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP 0 CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored <br /> on-site until appropriate disposal methods <br /> are determined. <br /> PACE 11 <br /> 5 <br />