My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
1805
>
3500 - Local Oversight Program
>
PR0545253
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:05:17 PM
Creation date
1/30/2020 11:33:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545253
PE
3528
FACILITY_ID
FA0009191
FACILITY_NAME
PENNY NEWMAN GRAIN
STREET_NUMBER
1805
STREET_NAME
HARBOR
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
1805 HARBOR RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith Technology Corporation <br /> Quality Assurance/Quality Control Plan <br /> Revised February 1995 <br /> f <br /> Equipment and well material decontamination will be conducted on an impermeable surface and all <br /> decontamination effluent will be contained. All surfaces of the equipment will be" thoroughly <br /> decontaminated using a steam cleaner. The equipment will be placed on a drying rack for air dry' ng: <br /> The decontamination water will be stored in containers certified for hazardous materials storage and <br /> disposed of in an approved manner. <br /> Sample equipment to be used for pesticides and organic analysis will be washed in a nonphosphate <br /> detergent (Alconox or equivalent) and rinsed with tap water, followed by deionized water. If the <br /> equipment is for metals analysis, the initial rinse will be conducted with 0.1 Nnitric acid followed by <br /> tap water and deionized water. <br /> i <br /> 7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE <br /> E <br /> The following measuring equipment may be used during the Remedial Investigation. Equipment is i <br /> grouped by field activity. Calibration procedures and fre uencY are listed by Piece. <br /> i <br /> r <br /> Soil Borines and Well Dimensions <br /> Steel and coated cloth tape. Calibration: none. <br /> Water Level Measurements in Wells <br /> Steel surveyors tape. Calibration: manufacturer supplied temperature correction will be applied } <br /> as applicable for field conditions. Electrical well sounders. Calibration: check against steel <br /> surveyor's tape. <br /> l <br /> W:1Admin\Shc1lslQAQC-97.DOC <br /> 5 <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.