Laserfiche WebLink
Smith Technology Corporation <br /> Quality Assurance/Quality Control Plan <br /> Revised February 1995 <br /> f <br /> Equipment and well material decontamination will be conducted on an impermeable surface and all <br /> decontamination effluent will be contained. All surfaces of the equipment will be" thoroughly <br /> decontaminated using a steam cleaner. The equipment will be placed on a drying rack for air dry' ng: <br /> The decontamination water will be stored in containers certified for hazardous materials storage and <br /> disposed of in an approved manner. <br /> Sample equipment to be used for pesticides and organic analysis will be washed in a nonphosphate <br /> detergent (Alconox or equivalent) and rinsed with tap water, followed by deionized water. If the <br /> equipment is for metals analysis, the initial rinse will be conducted with 0.1 Nnitric acid followed by <br /> tap water and deionized water. <br /> i <br /> 7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE <br /> E <br /> The following measuring equipment may be used during the Remedial Investigation. Equipment is i <br /> grouped by field activity. Calibration procedures and fre uencY are listed by Piece. <br /> i <br /> r <br /> Soil Borines and Well Dimensions <br /> Steel and coated cloth tape. Calibration: none. <br /> Water Level Measurements in Wells <br /> Steel surveyors tape. Calibration: manufacturer supplied temperature correction will be applied } <br /> as applicable for field conditions. Electrical well sounders. Calibration: check against steel <br /> surveyor's tape. <br /> l <br /> W:1Admin\Shc1lslQAQC-97.DOC <br /> 5 <br /> I <br /> i <br />