Laserfiche WebLink
SCHEDULE <br /> :ETS anticipates that the proposed Task A, B and C can be completed in about 4 <br /> weeks. <br /> COST ESTIMATE <br /> `Table 1 presents a summary of cost estimate for the tasks.. Attached please find ETS <br /> qualification materials for your reference. <br /> Owner will provide access, power and water at the site. <br /> Prepayment of 50% of proposed cost estimate- is required. 4 <br /> 'ETS will proceed with the proposed work upon authorization by Mr. Chuck Rice or <br /> authorized representative of Inland Paint Company. Please sign below and return a: <br /> copy for your approval to proceed. <br /> Thank you for your consideration for ou ` ERIN <br /> BEST REG S, A�Z�`��� <br /> Z> WALTER W. Lao , <br /> No. 1207 <br /> Walter W. Loo, CEG CHG of GA <br /> APPROVED BY: DATE: <br /> Owner Representative , <br /> r <br /> z <br /> r <br /> i <br /> I <br /> E <br /> I } <br /> 9 <br /> a <br />