My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
117
>
3500 - Local Oversight Program
>
PR0545260
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:18:21 PM
Creation date
1/30/2020 11:49:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545260
PE
3528
FACILITY_ID
FA0005325
FACILITY_NAME
INLAND PAINT COMPANY
STREET_NUMBER
117
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707031
CURRENT_STATUS
02
SITE_LOCATION
117 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 i <br /> f <br /> A S S O C I A T E S I N C <br /> Groundwater Sample Analysis <br /> t <br /> Groundwater samples will be submitted using chain-of-custody record to a State-certified <br /> laboratory. Groundwater samples will be analyzed for TPHg, TPHd, TPHss, BTEX, chlorinated . <br /> hydrocarbons, and.oxygenate fuel additives. Purge water will be stored on site in 55-gallon drums <br /> approved for hazardous liquid storage pending laboratory analysis. <br /> Report Preparation <br /> Upon completion of all field activities, a summary report will be prepared for submittal to <br /> PHS/EHD. ATC will prepare a report that will include a description of all field activities, <br /> laboratory analytical results, boring logs, manifests, and recommendations. <br /> All work described in this workplan will be performed under the direction. of a California <br /> i w Registered Professional Engineer. All fieldwork will be completed in accordance with the Site <br /> Safety Plan contained in Attachment 2. <br /> Projected Schedule . <br /> F <br /> Once approval of this workplan has been received, the Public Comment period is over, and State <br /> Cleanup Fund preapproval has been obtained, ATC will schedule excavation and drilling activities. <br /> It is anticipated the excavation activities will be completed in one day and drilling activities will be <br /> completed in one.day. ATC will notify PHS/EHD at least 48 hours prior to beginning any field <br /> activities. The summary report will be submitted to PHS/EHD approximately four to five weeks <br /> after the completion of field activities. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact our office at (209) 579-2221. <br /> Respectfully Submitted, <br /> ATC Associates Inc. <br /> F s�r�` <br /> Drew Van Allen CnC•u �/, 1 <br /> Staff Scientist ! <br /> L� _ �, <br /> 7e�eHomsey, P.E. ! . (1,, 10 <br /> Registered Engineer No. C47410x�. � <br /> Attachments <br /> ,Lr.. <br /> cc: . Mr. Chuck Wright, Inland Paint Company <br /> wA172951reportslwkpadd:doc 5 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.