My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
117
>
3500 - Local Oversight Program
>
PR0545260
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:18:21 PM
Creation date
1/30/2020 11:49:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545260
PE
3528
FACILITY_ID
FA0005325
FACILITY_NAME
INLAND PAINT COMPANY
STREET_NUMBER
117
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707031
CURRENT_STATUS
02
SITE_LOCATION
117 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 <br /> A TC Assocl ates SITE SAFETY PLAN <br /> Job Name: Inland Paint Company <br /> I <br /> Job Location: 117 West Harding Way, Stockton, California i <br /> Client Name: Inland Paint Company <br /> Project Number: 17295.0001 <br /> General Work Description: Preliminary Site Investigation <br /> SSP Prepared by: Drew Van Allen <br /> On-site Safety Officer: Tom Lutterman <br /> Project Safety Officer: Jeanne Homsey <br /> This site health and safety plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases"of site operations. The SSP must be reviewed and signed by all on- <br /> site employees, subcontractors, and visitors prior�"to entering the site. General safe work <br /> practices are identified in the ATC's Injury and Illness Prevention Manual and apply to all <br /> ATC work sites. <br /> The provisions set-forth_in ilhis SSP shall apply to ATC employees and any subcontractors <br /> working for ATC at the lob?site. Ail personnel working for ATC at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from,the safety provisions set-forth in this SSP, but only to upgrade or. <br /> increase the safety requirements. ATC personnel may suspend work if unsafe working <br /> conditions are identified or observed, or unauthorized modifications to the safety provisions set- <br /> forth in this SSP are made.1 If changes in site or working conditions require changes in safety <br /> procedures,appropriate amendments to this SSP will be provided by the ATC project manager <br /> or supervisor,with the written approval of a ATC project safety officer or the ATC Health and <br /> Safety Director. <br /> PMGE 3 <br /> i <br /> s <br /> I} <br />
The URL can be used to link to this page
Your browser does not support the video tag.