My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
117
>
3500 - Local Oversight Program
>
PR0545260
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:18:21 PM
Creation date
1/30/2020 11:49:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545260
PE
3528
FACILITY_ID
FA0005325
FACILITY_NAME
INLAND PAINT COMPANY
STREET_NUMBER
117
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707031
CURRENT_STATUS
02
SITE_LOCATION
117 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ATCAssociates S1TE SAFETY PLAN <br /> f <br /> KEY SAFETY PERSONNEL AND RESPONSIBILITIES <br /> All personnel working for ATC at the job site are responsible for project safety. The operational and health <br /> and safety responsibilities of pertinent ATC.personnel are identified below. <br /> F <br /> PROJECT MANAGER: Drew Van Allen <br /> E <br /> The Project Manager is responsible for the provisions and'.submittal of this SSP to the Site Safety Officer 4 <br /> (SSO) and for advising the SSO on health and safety:matters. He has the authority to provide for the <br /> auditing of compliance with the provisions of this SSP,suspend or modify work practices,and to recommend f <br /> disciplinary action for individuals whose conduct does not meet the provisions presented in this SSP. The <br /> Project Manager is also responsible for ensuring that Medical Surveillance Exams and Training Programs <br /> are current for all ;personnel working on-site. The Project Manager reports to the Corporate Safety <br /> Manager. <br /> SITE SAFETY OFFICER: Tom Lutterman <br /> The SSO is responsible for the di's'semination of the information contained in this SSP to all ATC personnel <br /> working at the job site,and to the responsible representative(s)of each subcontractor firm working for ATC } <br /> at the job site. The SSO is responsible for ensuring the following items are adequately addressed: Safety <br /> Supplies and Equipment Inventory; Aceident/Incident Reporting Procedures; <br /> Decontamination/Contamination Reduction Procedures;Gederal Safe Work Practices. <br /> The SSO has the authority to suspend work anytime shethe determines the safety provisions set-forth in this <br /> SSP are inadequate to ensure worker safety. The SSO shall also inform the Project Manager of individuals <br /> whose conduct does not meet the safety provisions of this SSP. The Site Safety Officer.reports to the Project <br /> Manager. A SSO or the alternate must be present during the field work operations. <br /> F <br /> } <br /> x <br /> .1 <br /> y <br /> PAGE 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.