Laserfiche WebLink
Summary of Violations-Response <br /> Item# Remarks Status Date Notes: <br /> Requesting an additional <br /> Item#Remarks 603 CFR 112.7(a)(3)Failed to adequately describe the physical layout of the facility in the Plan.The facility diagram 60 days while being <br /> included in the SPCC plan did not include connecting pipes.Describe in your Plan the physical layout of the facility and include a reviewed and updated <br /> facility diagram,which must mark the location and contents of each fixed oil storage container and the storage area where mobile or by Engineering <br /> 603 portable containers are located.The facility diagram must identify the location of and mark as"exempt'underground tanks that are Open Department. <br /> otherwise exempted from the requirements of this part under§112.1(d)(4).The facility diagram must also include all transfer stations <br /> and connecting pipes,including intra-facility gathering lines that are otherwise exempted from the requirements of this part under <br /> §112.1(d)(11).Immediately update the facility diagram to include all of the required information.Submit a legible copy of the updated <br /> facility diagram to the EHD for review.This is a repeat violation,Class II. <br /> CFR 112.7(a)(3)(i)Plan failed to include oil type and storage capacity for each container.The type of oil and storage capacity for each Requesting an additional <br /> mobile or portable container or an estimate of the potential number of mobile or portable containers was not discussed in the SPCC 60 days while being <br /> plan.The plan refers to the number of mobile or portable containers as"varies"The SPCC plan references the STI SP-001 industry reviewed and updated <br /> standard.Under the SP-001 standard,compartments of a split tank are individual tanks.The facility has one 20,000 gallons split tank by Engineering <br /> and a 30,000 gallon split tank.Under the definition of STI SP-001 for"capacity",the capacity of a compartment in a multi- Department. <br /> compartmented AST shall be considered a separate and distinct capacity,provided that the bulkhead between compartments is fully <br /> 604 `'gelded around its perimeter and compartments are not manifolded....You must also address in your Plan:...(i)The type of oil in each Oen <br /> fixed container and its storage capacity.For mobile or portable containers,either provide the type of oil and storage capacity for each p <br /> container or provide an estimate of the potential number of mobile or portable containers,the types of oil,and anticipated storage <br /> capacities;For mobile or portable containers,either provide the type of oil and the storage capacity for each container or provide an <br /> estimate of the potential number of mobile or portable containers,the types of oil and anticipated storage capacities.This should be <br /> discusses in the SPCC plan.This is a repeat violation,Class II. <br />