My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:33:14 PM
Creation date
1/30/2020 1:23:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 15, '19971 <br /> AtvTfl <br /> WALLACE • KUHL <br /> &ASSOCIATES INC. Mr. Harlin Knoll <br /> Public Health Services r;7 AUC is P 112:.21 <br /> San Joaquin County Environmental Health Division <br /> P.O. Box-388 <br /> Stockton, California 95201 <br /> RE: GRANITE CONSTRUCTION FACILITY' <br /> WKA No. 2088.08 <br /> Dear Mr-Knoll, <br /> Per our telephone conversation on August 14, 1997, this letter is to confirm with <br /> you that you have accepted our recommendation to change the groundwater <br /> sampling frequency for the above referenced site. Our new sampling schedule will <br /> include sampling monitoring wells MW1 through MW4 on a semi-annual basis or <br /> 1 until site closure is granted for the site. <br /> Based on the above, our next sampling event will take place in November of 1997. <br /> We will contact you 48-hours prior to our sampling.. Upon receipt of the analytical <br /> results, we will forward to you copies of our Groundwater Monitoring Report <br /> within one.to two weeks. <br /> As you may be aware,I have been transferred to'the Geotechnical Engineering <br /> t Division within our company and am being replaced as project manager. The new <br /> Geote,hnical Engineering project manager for this site will be Kurt Balasek. If you have. any questions, <br /> . , please do not hesitate to contact me or Kurt'at(916) 372-1434. <br /> Engineering Geology - - - <br /> s Envirhpm nod cw,n,ulpng Wallace'a Kuhl &Associates, Inc.` <br /> , Remediation Services <br /> Construction Insrectiott: _ <br /> Michael M. Watari, PE . <br /> 'Materials Testing Project Engineer <br /> l <br /> t cc: Mr. Hop Essick, Granite Construction, ' <br /> �i <br /> 1 3050 Industrial Blvd. <br /> � <br /> West Sacramento <br /> S CA 95691 . <br /> Fax 916.372.2565 <br /> h , <br /> 916.372.1434 <br /> Rce.G•a rover .,.. ... . -. . .:,......,.�,..,...,,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.