My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:33:14 PM
Creation date
1/30/2020 1:23:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NovembW, 1996 <br /> Mr. Harlin Knoll <br /> WALLACE•KUHL ?.t <br /> Er ASSOCIATES INC. San Joaquin County Public Health Services <br /> 304 24 <br /> E. Weber Avenue, Third Floor <br /> r1'0U -8 PIS 2 <br /> Stockton,California 95201-0388 <br /> 3 <br /> PROJECT STATUS I <br /> GRANITE CONSTRUCTION <br /> 10500 South Harlan Road <br /> French.Camp, California 95231 <br /> WKA No. 2088.08 <br /> Dear Mr. Knoll, ' . <br /> On behalf of Granite Construction, we are-submitting this project status letter <br /> for the above referenced site. We are currently preparing a Closure Report for <br /> the subject site. The Closure Report will include a historical summary of site <br /> investigations, RBCA evaluation, VLEACH analysis, and diagrams delineating <br /> lateral and vertical extent of petroleum hydrocarbon contamination. We <br /> anticipate'completion of the Closure Report in two to three weeks. As soon as <br /> the report is complete, we will forward copies of the report to yourself and the <br /> r <br /> Geotechnical Engineering Central Valley Regional Water Quality Control Board. <br /> 4 Engineering Geology Lastly, our quarterly sampling of monitoring wells at the site will be postponed <br /> l� Environmental Consulting until the completion of the Closure Report. At that time, we will evaluate the <br /> need for additional sampling at the site. <br /> Remediation Services <br /> Construction Inspection If you have any questions, please do not hesitate to contact me at our office at <br /> (916) 372-1434. <br /> Materials Testing <br /> Wallace • Kuhl,4 Associates, Inc. <br /> 3050 Industrial Blvd. Michael Watarl <br /> West Sacramento StaffEnglneer <br /> CA 95691 MMW <br /> Fax 916.372.2565 cc: Mr. Hop Essick. Granite Construction <br /> 916.372.1434 <br /> Reryded paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.