My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:33:14 PM
Creation date
1/30/2020 1:23:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> March 15, 1996 l t,r EYE Ir 9r f r <br /> WALLACE •KUHL C ?&.°i7 ,'r >,J� AL lI'I <br /> &ASSOCIATES INC. <br /> Mr. Harlin Knoll ' �= <br /> San Joaquin County Public Health Services 1 1 9: <br /> P.O. Box 388 <br /> Stockton, California 95201-2009 <br /> PROJECT WORK SCOPE AMENDMENT <br /> GRANITE CONSTRUCTION <br /> 10500 South Harlan Road <br /> French Camp, California 95231 <br /> Dear Mr. Knoll, <br /> I <br /> On behalf of Granite Construction, we are amending our project work scope for the <br /> _ _ m aboye referenced.site. The purpose_of.the_project_amendment is.to change,the—. <br /> sampling frequency of eight groundwater monitoring wells (MW1 through MW8). In� <br /> addition, we will discontinue analyzing water samples for Total Petroleum <br /> Hydrocarbons (TPH) as diesel due to the lack of detectable concentrations in <br /> previous samples. <br /> The eight monitoring wells will be sampled on.the following schedule: <br /> • MW1 through MW3 - Quarterly sampling <br /> �w <br /> • MW4.-and MW8 - Alternating semi-annual sampling <br /> • MW5 and MW6 - Discontinue sampling <br /> s MW7 - Annual Sampling <br /> Our next quarterly sampling is scheduled for April 1996. During the April sampling <br /> - Geotechnical Engineering event,groundwater measurements will be obtained from each well. In addition, two <br /> composite soil samples will be collected from the stockpiled soil located southwest of <br /> Engineering Geology the former UST locations. The two composite soil samples will be analyzed for TPH t <br /> " as gasoline and diesel using modified EPA Method 8015 and Benzene, Toluene, <br /> Environmental Consulting Ethylbenzene, and Xylenes using EPA Method 8020. Analytical results of the <br /> stockpile samples will be provided our next quarterly sampling report. <br /> - Remediation Services' <br /> If you have any questions, please.do not hesitate to contact our office (916) 372- <br /> Construction Inspection 1434. k <br /> ` Materials Testing W-7alla�ce ■ Kuhl & Associates, Inc. <br /> Michael Watari <br /> 3050 Industrial Blvd: <br /> Staff Engineer ., . <br /> West Sacramento - <br /> MMW:FJH:sdm <br /> CA 95691 <br /> Fax 916.372.2565 cc: Mr. Hop Essick, Granite Construction <br /> a M\W8M5.LT1 <br /> Z"_ `' 916.372.1434 <br /> Recycled paper - . <br />
The URL can be used to link to this page
Your browser does not support the video tag.