My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002571
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
ARCHIVED REPORTS_XR0002571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:51:08 PM
Creation date
1/30/2020 1:27:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002571
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> March 20, 1995 <br />' Page 2 <br />' Monitorine Well Develo ment Purging and Sampling <br />' After well construction was completed, the water level in each well was measured with an <br /> electronic well sounder and the wells were checked for free product using a clear disposable <br /> polyethylene bailer The wells were subsequently developed using a vented surge block <br /> Approximately three well volumes of water were then removed by using a submersible pump <br />' until temperature, pH and conductivity readings stabilized and/or the water cleared of sediment <br /> After a minimum of 24 hours from the time of development, the water level in each well was <br /> measured, and the water checked for visual signs of free product using a clear disposable <br /> rpolyethylene bailer Approximately three to five additional well volumes of water were purged <br /> using a clean bailer until temperature, pH, and conductivity readings stabilized and/or the water <br /> cleared of sediment The water samples were then collected using new disposable polyethylene <br /> bailers Water from the bailers was decanted into appropriate sample containers provided by the <br /> laboratory <br /> The samples were immediately placed in an ice-chest with ice, along with a travel blank, and <br /> submitted under chain-of-custody to a California-certified laboratory for analysis of TPH using <br /> EPA method 8015 and BTEX using EPA method 602 <br /> Water sampling equipment was cleaned prior to development and purging of each well with a <br /> Isolution of Alconox detergent and water to minimize the potential for cross contamination All <br /> water removed during development and purging operations was stored in sealed, labeled 55- <br /> gallon drums <br /> Subsequent to installation and completion, well locations and elevations were surveyed by a <br /> California-licensed surveyor to aid in the determination of the hydraulic gradient and flow <br /> direction <br /> WALLACE KUHL <br /> Rayed p." Sr ASSOCIATES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.