My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002580
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2900 - Site Mitigation Program
>
PR0508238
>
ARCHIVED REPORTS_XR0002580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 3:05:54 PM
Creation date
1/30/2020 1:34:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002580
RECORD_ID
PR0508238
PE
2950
FACILITY_ID
FA0008010
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r �■r r r ■r r r r = M r r r r r = r r <br /> 15 34 <br /> eG19E 6 53 / / / I / 1+ = APPROXIMATE BORING <br /> LOCATIONS/ S= PROXIMATE MONITORING WELL LOCATIONS <br /> ESTIMATED EXTENT OF SOIL CONTAMINATION <br /> CE = ELEVATION OF THE TOP OF PVC CASING ON THE <br /> NORTHERLY EDGE OF EACH MONITORING WELL <br /> / SMW4 OWE = GROUNDWATER ELEVATION (1 1/30/G 1) <br /> CE+ 512 <br /> GWE-8 24 / / / / �= GROUNDWATER FLOW DIRECTION <br /> ENCLOSED TANK STORAGE--,,, I / / 55 GALLON DMS T <br /> CxAINING GROUNDWA <br /> &R <br /> DOD NOTES <br /> / ASPT / / 1 SITE PLAN DRAFFED FROM FIELD MEASUREMENTS <br /> coNrFrE / �.CE+,5.68' <br /> ABOVEGRO D GWE 7807/ 2 MONITENGiNORING <br /> WELLS SURVEYED BY ROBERT E YOUNG <br /> ERS <br /> FORMER WASTE OIL UST / DIESEL K / / <br /> (CONCRETE PAD <br /> OVEGROUND EII` <br /> DIESEL TANK �WGROiNp GW 8 14 FIN7Afo <br /> rALLOd <br /> I ABOVEGROUND 0 / / f- -� B14 'ET 11.27 <br /> -------� BALK Qft TANKS ---- <br /> / I I 1 I MWS( <br /> II 85# ` Exla-la -u <br /> DISPENSERS CONCRETE DRIVE 12-12 <br /> ,-"----- 5-16 3-9 <br /> / MW29 -----�a # B4 B Ex <br /> 6-15 <br /> C-/+1588 / E----- B7 f Erl1-I0 EY2-145 EX1-1J <br /> WE-8 17' --- J f ` <br /> FORMER 12000 GALLON EL TANK ,l 83♦ EXIO-I9 A+J-11 <br /> FORMER 10000 GALLON DUNE TANKS X811 / / P1PEggL1NE <br /> / __� 88♦! F TREICH <br /> 810♦ 1 <br /> � t B15 \ / ----- 3 1 FORMER <br /> ���qqq I 111 DISPENSER <br /> /'18 ISLAND <br /> STORAGE SHED / � `831/ � <br /> I <br /> CEt142w�� f <br /> GWE-8/0' I J <br /> / I / GWE/7 86 <br /> / CF1484 <br /> Mw7m O 10 20 30 40 50 <br /> Scale in Feet <br /> • <br /> Drawn By BPM SITE PLAN-DETAIL A WKA NO 2088 09 <br /> GRANITE CONSTRUCTION DATE 11/01 <br /> WALLACE - KUHL & ASSOCIATES, INC Checked By MMW <br /> GEOTECHNICAL ENGINEERING French Camp, California PLATE NO 2 <br /> GEOLOGIC & ENVIRONMENTAL SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.